If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885072112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.648536,"lon":-115.061381,"icon":""}]} |
Location: 00/12-21-088-07W5/0 | |
Location Alias: 00/12-21-88-07 W5M | |
Location Alias 2: 00/12-21-088-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 07 | |
Section: 21 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: PEYTO ET AL REDE 12-21-88-7 | |
Operator Name: Transocean Oil Inc | |
License Number: 0036363 | |
License Date: 1969-06-13 | |
License Status: RecExempt | |
Spud Date: 1969-06-18 | |
Final Drill Date: 1969-07-07 | |
Well Total Depth: 1546.90 m | |
Surface Hole Latitude: 56.648536 | |
Surface Hole Longitude: -115.061381 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1969-06-13 | Obtained License |
1969-07-07 | Finished Drilling |
1969-07-07 | Well Mode changed to Drilled and Cased |
1969-07-09 | Drill Stem Test Performed |
1969-07-13 | Production Casing Operation Performed |
1969-07-16 | Perforation Treatment Performed - Jet Perforation |
1969-07-26 | Perforation Treatment Performed - Jet Perforation |
1969-11-26 | Well Began Production |
1969-11-26 | Well Fluid changed to Crude Oil |
1969-11-26 | Well Mode changed to Pumping |
1971-06-01 | Well Fluid changed to Crude Oil |
1971-06-01 | Well Mode changed to Suspended |
1972-10-01 | Well Fluid changed to Crude Oil |
1972-10-01 | Well Mode changed to Pumping |
1975-04-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1975-04-03 | Well Abandoned |
1975-04-03 | Well Fluid changed to Crude Oil |
1975-04-03 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1969-07-16 | Perforation | 1516.40 | 1518.20 | 7 |
1969-07-26 | Perforation | 1516.40 | 1518.20 | 13 |
1975-04-03 | Packing Device Capped w/Cement | 1500.80 | 1508.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1969 | 24 | 0.0 | 0.0 | 0.0 |
1970 | 600 | 0.0 | 0.0 | 0.0 |
1972 | 161 | 0.0 | 0.0 | 0.0 |
1973 | 794 | 0.0 | 0.0 | 0.0 |
1974 | 1011 | 0.0 | 0.0 | 0.0 |
1975 | 598 | 0.0 | 0.0 | 0.0 |
For data sources see[5]