X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885080510020

Well Details

Well ID: 0885080510020
Loading map...
Location: 02/10-05-088-08W5/0
Location Alias: 02/10-05-88-08 W5M
Location Alias 2: 02/10-05-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 05
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 10-5-88-8
Operator Name: Surge Energy Inc.
License Number: 0089045
License Date: 1981-02-18
License Status: Abandoned
Spud Date: 1980-11-16
Final Drill Date: 1980-12-07
Well Total Depth: 1339.00 m
Surface Hole Latitude: 56.606295
Surface Hole Longitude: -115.234309

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-21 Lost Circulation Occurred
1980-12-07 Finished Drilling
1980-12-07 Well Mode changed to Drilled and Cased
1980-12-08 Liner Casing Operation Performed
1981-01-12 Perforation Treatment Performed - Jet Perforation
1981-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-16 Perforation Treatment Performed - Fractured
1981-02-07 Well Began Production
1981-02-07 Well Fluid changed to Crude Oil
1981-02-07 Well Mode changed to Pumping
1981-02-18 Obtained License
1984-01-09 Well Fluid changed to Crude Oil
1984-01-09 Well Mode changed to Suspended
2009-01-13 Well Log Performed
2009-01-14 Well Log Performed
2009-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-15 Plug Back Performed
2009-01-15 Well Fluid changed to Crude Oil
2009-01-15 Well Mode changed to Abandoned Zone
2009-01-17 Perforation Treatment Performed - Cement Plug
2009-01-18 Well Abandoned
2009-01-18 Well Fluid changed to Crude Oil
2009-01-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-12 Perforation 1301.00 1304.70 13
1981-01-12 Perforation 1315.30 1318.50 13
1981-01-14 Acid Treatment 1301.00 1318.50 0
1981-01-16 Fracture 1301.00 1318.50 0
2009-01-15 Packing Device Capped w/Cement 900.30 1294.00 0
2009-01-17 Cement Plug 336.10 655.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 6546 0.0 0.0 0.0
1982 8203 0.0 0.0 0.0
1983 3231 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-11-21 Lost Circulation 570.00 1250.00

For data sources see[6]

References