X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885090111002

Well Details

Well ID: 0885090111002
Loading map...
Location: 00/11-01-088-09W5/2
Location Alias: 00/11-01-88-09 W5M
Location Alias 2: 00/11-01-088-09 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 01
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 11-1-88-9
Operator Name: Surge Energy Inc.
License Number: 0171021
License Date: 1994-09-30
License Status: Suspension
Spud Date: 1994-11-03
Final Drill Date: 1994-11-14
Well Total Depth: 1536.00 m
Surface Hole Latitude: 56.604525
Surface Hole Longitude: -115.287372

For data sources see[1][2]

Well History

Date Event
1994-09-30 Obtained License
1994-11-03 Well Log Performed
1994-11-05 Surface Casing Operation Performed
1994-11-06 Direction Drilling Operation Performed - Deviate
1994-11-14 Finished Drilling
1994-11-14 Well Mode changed to Drilled and Cased
1994-11-15 Well Log Performed
1994-11-16 Production Casing Operation Performed
1994-11-16 Rig Released
1995-01-06 Perforation Treatment Performed - Jet Perforation
1995-01-06 Well Log Performed
1999-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-11 Perforation Treatment Performed - Jet Perforation
1999-11-11 Plug Back Performed
1999-11-11 Well Log Performed
1999-12-03 Well Began Production
1999-12-03 Well Fluid changed to Crude Oil
1999-12-03 Well Mode changed to Pumping
2015-02-01 Well Fluid changed to Crude Oil
2015-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-11-06 372.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-06 Perforation 1487.00 1488.50 20
1995-01-06 Perforation 1492.50 1496.00 20
1995-01-06 Perforation 1497.00 1499.00 20
1999-11-11 Packing Device Capped w/Cement 1472.00 1480.00 0
1999-11-11 Perforation 1354.00 1428.20 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 670 0.0 0.0 0.0
2000 8059 0.0 0.0 0.0
2001 8708 0.0 0.0 0.0
2002 8754 0.0 0.0 0.0
2003 8524 0.0 0.0 0.0
2004 8548 0.0 0.0 0.0
2005 8715 0.0 0.0 0.0
2006 8643 0.0 0.0 0.0
2007 8728 0.0 0.0 0.0
2008 8441 0.0 0.0 0.0
2009 8198 0.0 0.0 0.0
2010 8654 0.0 0.0 0.0
2011 4475 0.0 0.0 0.0
2012 7757 0.0 0.0 0.0
2013 2771 0.0 0.0 0.0

For data sources see[6]

References