X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885090210000

Well Details

Well ID: 0885090210000
Loading map...
Location: 00/10-02-088-09W5/0
Location Alias: 00/10-02-88-09 W5M
Location Alias 2: 00/10-02-088-09 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 09
Section: 02
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 10-2-88-9
Operator Name: Surge Energy Inc.
License Number: 0030632
License Date: 1966-06-27
License Status: Suspension
Spud Date: 1966-06-28
Final Drill Date: 1966-07-17
Well Total Depth: 1443.20 m
Surface Hole Latitude: 56.604520
Surface Hole Longitude: -115.313538

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-06-27 Obtained License
1966-07-17 Finished Drilling
1966-07-17 Well Mode changed to Drilled and Cased
1966-07-18 Production Casing Operation Performed
1966-07-30 Perforation Treatment Performed - Jet Perforation
1966-07-30 Well Began Production
1966-07-30 Well Fluid changed to Crude Oil
1966-07-30 Well Mode changed to Flowing
1966-09-03 Well Fluid changed to Crude Oil
1966-09-03 Well Mode changed to Pumping
1966-10-12 Perforation Treatment Performed - Jet Perforation
1966-10-12 Well Fluid changed to Crude Oil
1966-10-12 Well Mode changed to Flowing
1967-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-05-28 Well Fluid changed to Crude Oil
1975-05-28 Well Mode changed to Pumping
1980-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-07-10 Well Fluid changed to Crude Oil
1980-07-10 Well Mode changed to Abandoned Zone
1980-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-30 Perforation Treatment Performed - Jet Perforation
1983-11-29 Perforation Treatment Performed - Fractured
2013-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-07-30 Perforation 1434.40 1435.30 7
1980-07-30 Acid Treatment 1282.60 1300.90 0
1983-11-29 Fracture 1282.60 1300.90 0
2013-01-11 Packing Device Capped w/Cement 1267.00 1275.00 0
1966-10-12 Perforation 1417.90 1419.10 7
1966-10-12 Perforation 1419.10 1419.80 13
1966-10-12 Perforation 1422.50 1424.00 13
1967-01-27 Acid Treatment 1417.90 1424.00 0
1980-07-10 Packing Device Capped w/Cement 1367.00 1375.00 0
1980-07-30 Perforation 1282.60 1284.20 7
1980-07-30 Perforation 1295.40 1299.10 7
1980-07-30 Perforation 1300.30 1300.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 2998 0.0 0.0 0.0
1968 4130 0.0 0.0 0.0
1969 6144 0.0 0.0 0.0
1970 5289 0.0 0.0 0.0
1971 8003 0.0 0.0 0.0
1972 2247 0.0 0.0 0.0
1973 258 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References