If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0885110609022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.602009,"lon":-115.761736,"icon":""}]} |
| Location: 02/09-06-088-11W5/2 | |
| Location Alias: 02/09-06-88-11 W5M | |
| Location Alias 2: 02/09-06-088-11 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 088 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 06 | |
| County/Municipality: Northern Sunrise County | |
| Well Name: MBOG EVI 9-6-88-11 | |
| Operator Name: Surge Energy Inc. | |
| License Number: 0422298 | |
| License Date: 2010-07-30 | |
| License Status: Issued | |
| Spud Date: 2011-08-21 | |
| Final Drill Date: 2011-09-13 | |
| Well Total Depth: 3326.50 m | |
| Surface Hole Latitude: 56.602009 | |
| Surface Hole Longitude: -115.761736 |
| Date | Event |
|---|---|
| 2010-07-30 | Obtained License |
| 2011-08-23 | Surface Casing Operation Performed |
| 2011-08-25 | Direction Drilling Operation Performed - Horizontal |
| 2011-08-28 | Intermediate Casing Operation Performed |
| 2011-09-08 | Direction Drilling Operation Performed - Horizontal |
| 2011-09-13 | Finished Drilling |
| 2011-09-13 | Well Log Performed |
| 2011-09-13 | Well Mode changed to Drilled and Cased |
| 2011-09-15 | Liner Casing Operation Performed |
| 2011-09-17 | Rig Released |
| 2011-09-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-30 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-10-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-12 | Well Began Production |
| 2011-10-12 | Well Fluid changed to Crude Oil |
| 2011-10-12 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-08-25 | 891.00 | Horizontal |
| 2011-09-08 | 1654.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-09-30 | Open Hole/Barefoot Completion | 3297.00 | 3326.50 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2739.20 | 2739.60 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2663.80 | 2664.20 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2604.30 | 2604.70 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2529.10 | 2529.50 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2455.90 | 2456.30 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2394.20 | 2394.60 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2318.80 | 2319.20 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2257.30 | 2257.70 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2181.90 | 2182.30 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2120.20 | 2120.60 | 0 |
| 2011-09-30 | Multi-Stage Fracture | 3287.70 | 3288.10 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2044.90 | 2045.30 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 1984.60 | 1985.00 | 0 |
| 2011-09-30 | Multi-Stage Fracture | 3222.50 | 3222.60 | 0 |
| 2011-09-30 | Multi-Stage Fracture | 3148.80 | 3149.20 | 0 |
| 2011-09-30 | Multi-Stage Fracture | 3075.00 | 3075.40 | 0 |
| 2011-09-30 | Multi-Stage Fracture | 3013.30 | 3013.70 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2937.90 | 2938.30 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2876.20 | 2876.60 | 0 |
| 2011-10-01 | Multi-Stage Fracture | 2800.90 | 2801.30 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 800 | 0.0 | 0.0 | 0.0 |
| 2012 | 7734 | 0.0 | 0.0 | 0.0 |
| 2013 | 8222 | 0.0 | 0.0 | 0.0 |
| 2014 | 8662 | 0.0 | 0.0 | 0.0 |
| 2015 | 8621 | 0.0 | 0.0 | 0.0 |
| 2016 | 8722 | 0.0 | 0.0 | 0.0 |
| 2017 | 8587 | 0.0 | 0.0 | 0.0 |
| 2018 | 8065 | 0.0 | 0.0 | 0.0 |
| 2019 | 8405 | 0.0 | 0.0 | 0.0 |
| 2020 | 2074 | 0.0 | 0.0 | 0.0 |
For data sources see[6]