If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0885120112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.602006,"lon":-115.75135,"icon":""}]} |
| Location: 00/12-01-088-12W5/0 | |
| Location Alias: 00/12-01-88-12 W5M | |
| Location Alias 2: 00/12-01-088-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 088 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 01 | |
| County/Municipality: Northern Sunrise County | |
| Well Name: MBOG EVI 12-1-88-12 | |
| Operator Name: Surge Energy Inc. | |
| License Number: 0422126 | |
| License Date: 2010-07-23 | |
| License Status: Issued | |
| Spud Date: 2011-01-28 | |
| Final Drill Date: 2011-02-12 | |
| Well Total Depth: 3130.00 m | |
| Surface Hole Latitude: 56.602006 | |
| Surface Hole Longitude: -115.751350 |
| Date | Event |
|---|---|
| 2010-07-23 | Obtained License |
| 2011-01-31 | Surface Casing Operation Performed |
| 2011-02-01 | Well Log Performed |
| 2011-02-03 | Direction Drilling Operation Performed - Horizontal |
| 2011-02-07 | Intermediate Casing Operation Performed |
| 2011-02-12 | Finished Drilling |
| 2011-02-12 | Well Mode changed to Drilled and Cased |
| 2011-02-14 | Liner Casing Operation Performed |
| 2011-02-15 | Rig Released |
| 2011-03-16 | Well Log Performed |
| 2011-03-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-04-14 | Well Began Production |
| 2011-04-14 | Well Fluid changed to Crude Oil |
| 2011-04-14 | Well Mode changed to Pumping |
| 2020-01-01 | Well Fluid changed to Crude Oil |
| 2020-01-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-02-03 | 938.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-03-20 | Open Hole/Barefoot Completion | 3125.00 | 3130.00 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 2542.50 | 2542.60 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 2469.00 | 2469.10 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 2395.60 | 2395.70 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 2322.00 | 2322.10 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 2248.50 | 2248.60 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 2175.00 | 2175.10 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 2101.60 | 2101.70 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 2028.10 | 2028.20 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 1968.30 | 1968.40 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 1896.10 | 1896.20 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 3102.40 | 3102.50 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 1824.20 | 1824.30 | 0 |
| 2011-03-21 | Multi-Stage Fracture | 1758.60 | 1758.70 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 3037.20 | 3037.30 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 2965.30 | 2965.40 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 2893.50 | 2893.60 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 2821.30 | 2821.40 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 2761.50 | 2761.60 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 2688.00 | 2688.10 | 0 |
| 2011-03-20 | Multi-Stage Fracture | 2616.00 | 2616.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 5339 | 0.0 | 0.0 | 0.0 |
| 2012 | 7920 | 0.0 | 0.0 | 0.0 |
| 2013 | 8602 | 0.0 | 0.0 | 0.0 |
| 2014 | 8586 | 0.0 | 0.0 | 0.0 |
| 2015 | 8585 | 0.0 | 0.0 | 0.0 |
| 2016 | 6374 | 0.0 | 0.0 | 0.0 |
| 2017 | 7533 | 0.0 | 0.0 | 0.0 |
| 2018 | 1349 | 0.0 | 0.0 | 0.0 |
For data sources see[6]