X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885121213022

Well Details

Well ID: 0885121213022
Loading map...
Location: 02/13-12-088-12W5/2
Location Alias: 02/13-12-88-12 W5M
Location Alias 2: 02/13-12-088-12 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 12
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 13-12-88-12
Operator Name: Surge Energy Inc.
License Number: 0432199
License Date: 2011-03-08
License Status: Issued
Spud Date: 2011-09-09
Final Drill Date: 2011-10-03
Well Total Depth: 3215.00 m
Surface Hole Latitude: 56.619132
Surface Hole Longitude: -115.751866

For data sources see[1][2]

Well History

Date Event
2011-03-08 Obtained License
2011-09-11 Surface Casing Operation Performed
2011-09-13 Direction Drilling Operation Performed - Horizontal
2011-09-17 Intermediate Casing Operation Performed
2011-09-23 Well Log Performed
2011-09-28 Direction Drilling Operation Performed - Horizontal
2011-10-03 Finished Drilling
2011-10-03 Well Log Performed
2011-10-03 Well Mode changed to Drilled and Cased
2011-10-05 Liner Casing Operation Performed
2011-10-06 Rig Released
2011-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-27 Perforation Treatment Performed - Open-Hole Completion
2011-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-24 Well Began Production
2011-11-24 Well Fluid changed to Crude Oil
2011-11-24 Well Mode changed to Pumping
2012-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-11-15 Well Began Injection
2014-11-15 Well Fluid changed to Water
2014-11-15 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-13 1063.00 Horizontal
2011-09-28 1717.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-27 Open Hole/Barefoot Completion 3210.00 3215.00 0
2011-10-28 Multi-Stage Fracture 2648.70 2649.70 0
2011-10-28 Multi-Stage Fracture 2573.60 2574.60 0
2011-10-28 Multi-Stage Fracture 2514.70 2515.70 0
2011-10-28 Multi-Stage Fracture 2439.70 2440.70 0
2011-10-28 Multi-Stage Fracture 2378.70 2379.70 0
2011-10-28 Multi-Stage Fracture 2303.70 2304.70 0
2011-10-28 Multi-Stage Fracture 2242.10 2243.10 0
2011-10-28 Multi-Stage Fracture 2166.80 2167.80 0
2011-10-28 Multi-Stage Fracture 2105.10 2106.10 0
2011-10-28 Multi-Stage Fracture 2043.90 2044.90 0
2011-10-27 Multi-Stage Fracture 3187.00 3188.00 0
2012-02-18 Acid Treatment 2043.90 3215.00 0
2011-10-27 Multi-Stage Fracture 3120.50 3121.50 0
2011-10-27 Multi-Stage Fracture 3045.30 3046.30 0
2011-10-27 Multi-Stage Fracture 2984.10 2985.10 0
2011-10-27 Multi-Stage Fracture 2908.80 2909.80 0
2011-10-27 Multi-Stage Fracture 2847.20 2848.20 0
2011-10-27 Multi-Stage Fracture 2772.00 2773.00 0
2011-10-28 Multi-Stage Fracture 2710.40 2711.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 408 0.0 0.0 0.0
2012 7118 0.0 0.0 0.0
2013 8403 0.0 0.0 0.0
2014 4234 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-13 No Incident Encountered 0.00 0.00

For data sources see[7]

References