X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885121404030

Well Details

Well ID: 0885121404030
Loading map...
Location: 03/04-14-088-12W5/0
Location Alias: 03/04-14-88-12 W5M
Location Alias 2: 03/04-14-088-12 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 14
County/Municipality: Northern Sunrise County
Well Name: PPR 103 EVI 4-14-88-12
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0446838
License Date: 2012-06-26
License Status: Issued
Spud Date: 2012-08-16
Final Drill Date: 2012-08-27
Well Total Depth: 3197.00 m
Surface Hole Latitude: 56.628985
Surface Hole Longitude: -115.777139

For data sources see[1][2]

Well History

Date Event
2012-06-26 Obtained License
2012-08-17 Surface Casing Operation Performed
2012-08-20 Direction Drilling Operation Performed - Horizontal
2012-08-27 Finished Drilling
2012-08-27 Well Mode changed to Drilled and Cased
2012-08-29 Production Casing Operation Performed
2012-08-30 Rig Released
2012-09-02 Well Log Performed
2012-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-11 Well Began Production
2012-10-11 Well Fluid changed to Crude Oil
2012-10-11 Well Mode changed to Pumping
2013-11-01 Well Began Injection
2013-11-01 Well Fluid changed to Water
2013-11-01 Well Type changed to Injection

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-16 Precision Drilling Corporation 104 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-20 1089.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-23 Multi-Stage Fracture 3174.00 3174.10 0
2012-09-24 Multi-Stage Fracture 2458.40 2558.50 0
2012-09-24 Multi-Stage Fracture 2380.80 2380.90 0
2012-09-24 Multi-Stage Fracture 2304.60 2304.70 0
2012-09-24 Multi-Stage Fracture 2241.30 2241.40 0
2012-09-24 Multi-Stage Fracture 2166.40 2166.50 0
2012-09-24 Multi-Stage Fracture 2089.30 2089.40 0
2012-09-24 Multi-Stage Fracture 2021.00 2021.10 0
2012-09-24 Multi-Stage Fracture 1945.40 1945.50 0
2012-09-24 Multi-Stage Fracture 1876.60 1876.70 0
2012-09-23 Multi-Stage Fracture 3102.30 3102.40 0
2012-09-23 Multi-Stage Fracture 3025.00 3025.10 0
2012-09-23 Multi-Stage Fracture 2962.00 2962.10 0
2012-09-23 Multi-Stage Fracture 2886.20 2886.30 0
2012-09-23 Multi-Stage Fracture 2810.50 2810.60 0
2012-09-23 Multi-Stage Fracture 2747.50 2747.60 0
2012-09-24 Multi-Stage Fracture 2585.00 2585.10 0
2012-09-24 Multi-Stage Fracture 2521.70 2521.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1603 0.0 0.0 0.0
2013 2812 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-30 No Incident Encountered 0.00 0.00
2012-09-24 No Incident Encountered 0.00 0.00
2013-08-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References