X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885122616000

Well Details

Well ID: 0885122616000
Loading map...
Location: 00/16-26-088-12W5/0
Location Alias: 00/16-26-88-12 W5M
Location Alias 2: 00/16-26-088-12 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 12
Section: 26
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 16-26-88-12
Operator Name: Surge Energy Inc.
License Number: 0438986
License Date: 2011-11-16
License Status: Amended
Spud Date: 2012-02-10
Final Drill Date: 2012-03-01
Well Total Depth: 3462.00 m
Surface Hole Latitude: 56.659584
Surface Hole Longitude: -115.813181

For data sources see[1][2]

Well History

Date Event
2011-11-16 Obtained License
2012-02-14 Surface Casing Operation Performed
2012-02-14 Well Log Performed
2012-02-15 Lost Circulation Occurred
2012-02-19 Direction Drilling Operation Performed - Deviate
2012-02-20 Direction Drilling Operation Performed - Horizontal
2012-02-21 Well Log Performed
2012-02-25 Intermediate Casing Operation Performed
2012-03-01 Finished Drilling
2012-03-01 Well Log Performed
2012-03-01 Well Structure changed to Drain
2012-03-04 Liner Casing Operation Performed
2012-03-17 Well Log Performed
2012-03-18 Rig Released
2012-04-11 Well Log Performed
2012-05-22 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-22 Perforation Treatment Performed - Open-Hole Completion
2012-05-23 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-10 Precision Drilling Corporation 185 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-19 1172.00 Deviate (5 - 79 degrees)
2012-02-20 1805.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-22 Open Hole/Barefoot Completion 3453.00 3462.00 0
2012-05-22 Multi-Stage Fracture 2946.90 2947.00 0
2012-05-22 Multi-Stage Fracture 2877.70 2877.80 0
2012-05-22 Multi-Stage Fracture 2821.20 2821.30 0
2012-05-22 Multi-Stage Fracture 2764.80 2764.90 0
2012-05-22 Multi-Stage Fracture 2694.90 2695.00 0
2012-05-22 Multi-Stage Fracture 2638.50 2638.60 0
2012-05-22 Multi-Stage Fracture 2582.00 2582.10 0
2012-05-23 Multi-Stage Fracture 2512.10 2512.20 0
2012-05-23 Multi-Stage Fracture 2455.60 2455.70 0
2012-05-23 Multi-Stage Fracture 2399.20 2399.30 0
2012-05-22 Multi-Stage Fracture 3424.30 3424.40 0
2012-05-23 Multi-Stage Fracture 2329.20 2329.30 0
2012-05-23 Multi-Stage Fracture 2272.80 2272.90 0
2012-05-22 Multi-Stage Fracture 3368.20 3368.30 0
2012-05-22 Multi-Stage Fracture 3311.80 3311.90 0
2012-05-22 Multi-Stage Fracture 3242.00 3242.10 0
2012-05-22 Multi-Stage Fracture 3185.50 3185.60 0
2012-05-22 Multi-Stage Fracture 3129.10 3129.20 0
2012-05-22 Multi-Stage Fracture 3059.20 3059.30 0
2012-05-22 Multi-Stage Fracture 3003.30 3003.40 0

For data sources see[6]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-15 Lost Circulation 709.90 1925.00
2012-06-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References