If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0886072006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.644088,"lon":-119.082792,"icon":""}]} |
Location: 00/06-20-088-07W6/0 | |
Location Alias: 00/06-20-88-07 W6M | |
Location Alias 2: 00/06-20-088-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 6 | |
Range: 07 | |
Section: 20 | |
County/Municipality: Clear Hills County | |
Well Name: OLY WORSLEY 6-20-88-7 | |
Operator Name: Shoreline Energy Corp. | |
License Number: 0061363 | |
License Date: 1976-11-29 | |
License Status: Abandoned | |
Spud Date: 1976-12-03 | |
Final Drill Date: 1976-12-28 | |
Well Total Depth: 2786.80 m | |
Surface Hole Latitude: 56.644088 | |
Surface Hole Longitude: -119.082792 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-11-29 | Obtained License |
1976-12-28 | Finished Drilling |
1976-12-30 | Drill Stem Test Performed |
1976-12-31 | Drill Stem Test Performed |
1977-01-02 | Production Casing Operation Performed |
1977-01-30 | Perforation Treatment Performed - Jet Perforation |
1977-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-03-23 | Well Mode changed to Drilled and Cased |
1990-08-03 | Perforation Treatment Performed - Jet Perforation |
1990-08-06 | Perforation Treatment Performed - Jet Perforation |
1994-03-01 | Well Began Production |
1994-03-01 | Well Fluid changed to Gas |
1994-03-01 | Well Mode changed to Flowing |
1995-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-10-05 | Plug Back Performed |
1995-10-05 | Well Fluid changed to Gas |
1995-10-05 | Well Log Performed |
1995-10-05 | Well Mode changed to Abandoned Zone |
1995-10-06 | Perforation Treatment Performed - Jet Perforation |
1995-10-06 | Well Log Performed |
1996-03-21 | Perforation Treatment Performed - Jet Perforation |
1996-03-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-02-16 | Perforation Treatment Performed - Jet Perforation |
2003-02-18 | Perforation Treatment Performed - Jet Perforation |
2003-02-19 | Well Log Performed |
2003-02-20 | Perforation Treatment Performed - Cement Squeeze |
2003-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-02-21 | Plug Back Performed |
2003-02-21 | Well Log Performed |
2003-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-02-22 | Plug Back Performed |
2019-01-19 | Perforation Treatment Performed - Jet Perforation |
2019-01-19 | Well Log Performed |
2019-01-20 | Perforation Treatment Performed - Cement Plug |
2019-01-20 | Perforation Treatment Performed - Cement Squeeze |
2019-01-20 | Plug Back Performed |
2019-01-21 | Perforation Treatment Performed - Jet Perforation |
2019-01-21 | Well Log Performed |
2019-01-22 | Perforation Treatment Performed - Cement Plug |
2019-01-22 | Perforation Treatment Performed - Cement Squeeze |
2019-01-22 | Plug Back Performed |
2019-02-25 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-01-30 | Perforation | 1327.40 | 1330.50 | 13 |
1996-03-26 | Acid Treatment | 1226.50 | 1235.00 | 0 |
2003-02-16 | Perforation | 1306.40 | 1307.30 | 14 |
2003-02-18 | Perforation | 1327.40 | 1330.50 | 13 |
2003-02-20 | Cement Squeeze | 1327.40 | 1330.50 | 0 |
2003-02-21 | Packing Device Capped w/Cement | 1312.00 | 1320.00 | 0 |
2003-02-22 | Packing Device Capped w/Cement | 1287.00 | 1295.00 | 0 |
2003-02-22 | Packing Device Capped w/Cement | 1207.00 | 1215.00 | 0 |
2019-01-19 | Perforation | 935.00 | 936.00 | 17 |
2019-01-19 | Perforation | 889.00 | 890.00 | 17 |
2019-01-20 | Cement Squeeze | 935.00 | 936.00 | 0 |
1977-02-01 | Acid Treatment | 1327.40 | 1330.50 | 0 |
2019-01-20 | Cement Squeeze | 889.00 | 890.00 | 0 |
2019-01-20 | Cement Plug | 871.50 | 952.00 | 0 |
2019-01-21 | Perforation | 588.00 | 589.00 | 17 |
2019-01-21 | Perforation | 372.00 | 373.00 | 17 |
2019-01-21 | Perforation | 335.00 | 336.00 | 17 |
2019-01-21 | Perforation | 321.00 | 322.00 | 17 |
2019-01-22 | Cement Squeeze | 588.00 | 589.00 | 0 |
2019-01-22 | Cement Squeeze | 372.00 | 373.00 | 0 |
2019-01-22 | Cement Squeeze | 335.00 | 336.00 | 0 |
2019-01-22 | Cement Squeeze | 321.00 | 322.00 | 0 |
1990-08-03 | Perforation | 1343.20 | 1346.00 | 13 |
2019-01-22 | Cement Plug | 172.50 | 607.00 | 0 |
1990-08-06 | Perforation | 1334.70 | 1338.90 | 13 |
1995-10-05 | Packing Device Capped w/Cement | 1310.00 | 1320.00 | 0 |
1995-10-06 | Perforation | 1306.40 | 1307.30 | 14 |
1996-03-21 | Perforation | 1226.50 | 1227.70 | 14 |
1996-03-21 | Perforation | 1233.80 | 1235.00 | 14 |
1996-03-21 | Perforation | 1301.50 | 1302.40 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 4313 | 0.0 | 0.0 | 0.0 |
1995 | 2466 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-02-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]