X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0886120909003

Well Details

Well ID: 0886120909003
Loading map...
Location: 00/09-09-088-12W6/3
Location Alias: 00/09-09-88-12 W6M
Location Alias 2: 00/09-09-088-12 W6/03
Country: Canada
Province: Alberta
Township: 088
Meridian: 6
Range: 12
Section: 09
County/Municipality: Clear Hills County
Well Name: CEQUENCE BDYLKS 9-9-88-12
Operator Name: Cequence Energy Ltd.
License Number: 0343411
License Date: 2005-11-24
License Status: Abandoned
Spud Date: 2005-12-15
Final Drill Date: 2005-12-21
Well Total Depth: 1409.00 m
Surface Hole Latitude: 56.618634
Surface Hole Longitude: -119.841186

For data sources see[1][2]

Well History

Date Event
2005-11-24 Obtained License
2005-12-16 Surface Casing Operation Performed
2005-12-21 Finished Drilling
2005-12-21 Well Log Performed
2005-12-21 Well Mode changed to Drilled and Cased
2005-12-22 Production Casing Operation Performed
2005-12-23 Rig Released
2006-03-04 Perforation Treatment Performed - Jet Perforation
2006-03-06 Perforation Treatment Performed - Fractured
2006-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-10 Perforation Treatment Performed - Jet Perforation
2006-03-10 Plug Back Performed
2006-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-15 Perforation Treatment Performed - Jet Perforation
2006-03-15 Plug Back Performed
2006-08-01 Well Began Production
2006-08-01 Well Fluid changed to Gas
2006-08-01 Well Mode changed to Flowing
2008-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-21 Plug Back Performed
2008-03-21 Well Fluid changed to Gas
2008-03-21 Well Mode changed to Abandoned Zone
2019-02-13 Perforation Treatment Performed - Jet Perforation
2019-02-13 Well Log Performed
2019-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-14 Perforation Treatment Performed - Cement Squeeze
2019-02-15 Well Abandoned
2019-02-15 Well Fluid changed to Gas
2019-02-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-04 Perforation 1337.00 1339.00 20
2019-02-14 Cement Squeeze 204.00 206.00 0
2019-02-14 Packing Device Capped w/Cement 189.00 200.00 0
2006-03-06 Fracture 1337.00 1339.00 0
2006-03-10 Packing Device Capped w/Cement 1322.00 1330.00 0
2006-03-10 Perforation 1239.00 1240.00 20
2006-03-12 Acid Treatment 1239.00 1240.00 0
2006-03-15 Packing Device Capped w/Cement 1227.00 1235.00 0
2006-03-15 Perforation 1186.00 1187.00 20
2008-03-21 Packing Device Capped w/Cement 1166.00 1174.00 0
2019-02-13 Perforation 204.00 206.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 2802 0.0 0.0 0.0
2007 384 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References