If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0895032806000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.747941,"lon":-114.414795,"icon":""}]} |
Location: 00/06-28-089-03W5/0 | |
Location Alias: 00/06-28-89-03 W5M | |
Location Alias 2: 00/06-28-089-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 089 | |
Meridian: 5 | |
Range: 03 | |
Section: 28 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: PRED TROUT 6-28-89-3 | |
Operator Name: Highwood Oil Company Ltd. | |
License Number: 0151750 | |
License Date: 1992-02-18 | |
License Status: Abandoned | |
Spud Date: 1992-02-22 | |
Final Drill Date: 1992-03-04 | |
Well Total Depth: 1490.00 m | |
Surface Hole Latitude: 56.747941 | |
Surface Hole Longitude: -114.414795 |
Date | Event |
---|---|
1992-02-18 | Obtained License |
1992-02-25 | Well Log Performed |
1992-02-26 | Surface Casing Operation Performed |
1992-02-28 | Well Log Performed |
1992-02-29 | Intermediate Casing Operation Performed |
1992-03-04 | Finished Drilling |
1992-03-04 | Well Log Performed |
1992-03-04 | Well Mode changed to Drilled and Cased |
1992-03-06 | Liner Casing Operation Performed |
1992-03-07 | Rig Released |
1992-03-14 | Perforation Treatment Performed - Cement Squeeze |
1992-03-14 | Perforation Treatment Performed - Jet Perforation |
1992-03-15 | Perforation Treatment Performed - Jet Perforation |
1992-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-03-23 | Well Began Production |
1992-03-23 | Well Fluid changed to Crude Oil |
1992-03-23 | Well Mode changed to Pumping |
2001-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-09-10 | Plug Back Performed |
2001-09-10 | Well Fluid changed to Crude Oil |
2001-09-10 | Well Mode changed to Abandoned Zone |
2001-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-09-11 | Well Log Performed |
2004-09-07 | Well Abandoned |
2004-09-07 | Well Fluid changed to Crude Oil |
2004-09-07 | Well Mode changed to Abandoned |
2010-01-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-01-15 | Well Log Performed |
2010-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-03-14 | Perforation | 1478.00 | 1479.00 | 13 |
2001-09-11 | Packing Device Capped w/Cement | 430.00 | 438.00 | 0 |
2010-01-14 | Packing Device Capped w/Cement | 925.60 | 955.60 | 0 |
2010-01-17 | Packing Device Capped w/Cement | 582.00 | 597.00 | 0 |
1992-03-14 | Cement Squeeze | 1478.00 | 1479.00 | 0 |
1992-03-15 | Perforation | 1464.00 | 1466.00 | 13 |
1992-03-15 | Perforation | 1468.50 | 1470.00 | 13 |
1992-03-15 | Perforation | 1470.50 | 1473.00 | 13 |
1992-03-15 | Perforation | 1474.00 | 1477.50 | 13 |
1992-03-17 | Acid Treatment | 1464.00 | 1477.50 | 0 |
2001-09-10 | Packing Device Capped w/Cement | 1449.00 | 1457.00 | 0 |
2001-09-11 | Packing Device Capped w/Cement | 748.00 | 756.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 6433 | 0.0 | 0.0 | 0.0 |
1993 | 7279 | 0.0 | 0.0 | 0.0 |
1994 | 8272 | 0.0 | 0.0 | 0.0 |
1995 | 7454 | 0.0 | 0.0 | 0.0 |
1996 | 8010 | 0.0 | 0.0 | 0.0 |
1997 | 8546 | 0.0 | 0.0 | 0.0 |
1998 | 4404 | 0.0 | 0.0 | 0.0 |
2000 | 275 | 0.0 | 0.0 | 0.0 |
2001 | 4312 | 0.0 | 0.0 | 0.0 |
For data sources see[5]