If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0895043310000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/10-33-089-04W5/0 | |
Location Alias: 00/10-33-89-04 W5M | |
Location Alias 2: 00/10-33-089-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 089 | |
Meridian: 5 | |
Range: 04 | |
Section: 33 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: CANOR ET AL TROUT 10-33-89-4 | |
Operator Name: Enerplus Corporation | |
License Number: 0158348 | |
License Date: 1993-05-18 | |
License Status: RecCertified | |
Spud Date: 1993-06-10 | |
Final Drill Date: 1993-06-19 | |
Well Total Depth: 1464.60 m | |
Surface Hole Latitude: 56.762981 | |
Surface Hole Longitude: -114.566911 |
Date | Event |
---|---|
1993-05-18 | Obtained License |
1993-06-14 | Surface Casing Operation Performed |
1993-06-19 | Finished Drilling |
1993-06-19 | Well Log Performed |
1993-06-20 | Production Casing Operation Performed |
1993-06-20 | Rig Released |
1993-06-20 | Well Mode changed to Drilled and Cased |
1993-06-27 | Perforation Treatment Performed - Open-Hole Completion |
1993-06-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-29 | Well Log Performed |
1993-07-01 | Perforation Treatment Performed - Open-Hole Completion |
2005-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-02-09 | Perforation Treatment Performed - Jet Perforation |
2005-02-09 | Plug Back Performed |
2005-02-09 | Well Mode changed to Abandoned Zone |
2005-02-11 | Perforation Treatment Performed - Remedial Casing |
2005-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-02-12 | Plug Back Performed |
2005-02-14 | Well Abandoned |
2005-02-14 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-06-27 | Open Hole/Barefoot Completion | 1445.80 | 1460.10 | 0 |
1993-06-29 | Acid Treatment | 1445.80 | 1460.10 | 0 |
1993-07-01 | Open Hole/Barefoot Completion | 1445.80 | 1464.60 | 0 |
2005-02-09 | Packing Device Capped w/Cement | 1415.00 | 1430.00 | 0 |
2005-02-09 | Perforation | 617.00 | 618.00 | 17 |
2005-02-11 | Remedial Casing Cementing | 617.00 | 618.00 | 0 |
2005-02-12 | Packing Device Capped w/Cement | 525.60 | 533.60 | 0 |
For data sources see[4]