X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0895053004020

Well Details

Well ID: 0895053004020
Loading map...
Location: 02/04-30-089-05W5/0
Location Alias: 02/04-30-89-05 W5M
Location Alias 2: 02/04-30-089-05 W5/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 5
Range: 05
Section: 30
County/Municipality: Municipal District of Opportunity No. 17
Well Name: COGI KIDNEY 4-30-89-5
Operator Name: Canadian Oil & Gas International Inc.
License Number: 0346433
License Date: 2005-12-21
License Status: Issued
Spud Date: 2006-04-28
Final Drill Date: 2006-05-13
Well Total Depth: 1532.00 m
Surface Hole Latitude: 56.744120
Surface Hole Longitude: -114.796478

For data sources see[1][2]

Well History

Date Event
2005-12-21 Obtained License
2006-05-01 Well Log Performed
2006-05-02 Surface Casing Operation Performed
2006-05-07 Intermediate Casing Operation Performed
2006-05-07 Well Log Performed
2006-05-13 Finished Drilling
2006-05-13 Well Mode changed to Drilled and Cased
2006-05-14 Well Log Performed
2006-05-15 Liner Casing Operation Performed
2006-05-16 Rig Released
2006-07-02 Perforation Treatment Performed - Jet Perforation
2006-07-03 Perforation Treatment Performed - Jet Perforation
2006-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-08-25 Well Began Production
2006-08-25 Well Fluid changed to Crude Oil
2006-08-25 Well Mode changed to Pumping
2010-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-02 Plug Back Performed
2013-11-02 Well Fluid changed to Crude Oil
2013-11-02 Well Mode changed to Abandoned Zone
2013-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-21 Plug Back Performed
2013-11-25 Perforation Treatment Performed - Jet Perforation
2013-11-26 Perforation Treatment Performed - Cement Squeeze
2013-11-26 Plug Back Performed
2013-12-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2013-12-05 Perforation Treatment Performed - Jet Perforation
2013-12-07 Perforation Treatment Performed - Cement Squeeze
2013-12-07 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-07-02 Perforation 1510.50 1516.00 17
2013-12-05 Perforation 470.00 471.00 17
2013-12-07 Cement Squeeze 470.00 471.00 0
2006-07-03 Perforation 1504.50 1510.50 17
2006-07-05 Acid Treatment 1504.50 1516.00 0
2010-11-01 Acid Treatment 1504.50 1516.00 0
2013-11-02 Packing Device Capped w/Cement 1486.00 1495.00 0
2013-11-21 Packing Device Capped w/Cement 1050.00 1059.00 0
2013-11-25 Perforation 698.00 709.00 17
2013-11-26 Cement Squeeze 698.00 709.00 0
2013-12-05 Bridge Plug, No Cement 474.90 475.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3672 0.0 0.0 0.0
2007 7151 0.0 0.0 0.0
2008 8603 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 1912 0.0 0.0 0.0
2011 6783 0.0 0.0 0.0
2012 4670 0.0 0.0 0.0
2013 3645 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References