X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0895082403000

Well Details

Well ID: 0895082403000
Loading map...
Location: 00/03-24-089-08W5/0
Location Alias: 00/03-24-89-08 W5M
Location Alias 2: 00/03-24-089-08 W5/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 5
Range: 08
Section: 24
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 3-24-89-8
Operator Name: Surge Energy Inc.
License Number: 0087381
License Date: 1980-12-01
License Status: Suspension
Spud Date: 1980-12-06
Final Drill Date: 1981-01-10
Well Total Depth: 1467.00 m
Surface Hole Latitude: 56.727790
Surface Hole Longitude: -115.135752

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-01 Obtained License
1980-12-08 Drill Stem Test Performed
1980-12-10 Drill Stem Test Performed
1980-12-15 Drill Stem Test Performed
1980-12-16 Lost Circulation Occurred
1980-12-17 Kick Occurred
1981-01-05 Drill Stem Test Performed
1981-01-10 Finished Drilling
1981-01-12 Drill Stem Test Performed
1981-01-14 Liner Casing Operation Performed
1981-01-23 Perforation Treatment Performed - Jet Perforation
1981-01-27 Perforation Treatment Performed - Jet Perforation
1981-02-03 Perforation Treatment Performed - Cement Squeeze
1981-02-09 Perforation Treatment Performed - Cement Squeeze
1981-02-17 Perforation Treatment Performed - Jet Perforation
1981-02-22 Well Mode changed to Drilled and Cased
1982-01-11 Well Began Production
1982-01-11 Well Fluid changed to Crude Oil
1982-01-11 Well Mode changed to Pumping
1987-03-31 Well Fluid changed to Crude Oil
1987-03-31 Well Mode changed to Suspended
1989-01-11 Well Fluid changed to Crude Oil
1989-01-11 Well Mode changed to Pumping
2009-04-01 Well Fluid changed to Crude Oil
2009-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-23 Perforation 393.50 395.00 13
1981-01-23 Perforation 402.00 403.50 13
1981-01-23 Perforation 405.00 406.00 13
1981-01-27 Perforation 415.50 421.50 7
1981-02-03 Cement Squeeze 393.50 421.50 0
1981-02-09 Cement Squeeze 393.50 421.50 0
1981-02-17 Perforation 1437.00 1442.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2149 0.0 0.0 0.0
1983 1951 0.0 0.0 0.0
1984 2954 0.0 0.0 0.0
1985 2580 0.0 0.0 0.0
1986 1398 0.0 0.0 0.0
1989 2780 0.0 0.0 0.0
1990 3147 0.0 0.0 0.0
1991 2721 0.0 0.0 0.0
1992 2319 0.0 0.0 0.0
1993 2045 0.0 0.0 0.0
1994 1750 0.0 0.0 0.0
1995 2660 0.0 0.0 0.0
1996 3130 0.0 0.0 0.0
1997 2802 0.0 0.0 0.0
1998 3265 0.0 0.0 0.0
1999 2848 0.0 0.0 0.0
2000 3085 0.0 0.0 0.0
2001 2666 0.0 0.0 0.0
2002 3036 0.0 0.0 0.0
2003 120 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-12-16 Lost Circulation 650.00 650.00
1980-12-17 Kick 633.00 1098.00

For data sources see[6]

References