X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0895082808000

Well Details

Well ID: 0895082808000
Loading map...
Location: 00/08-28-089-08W5/0
Location Alias: 00/08-28-89-08 W5M
Location Alias 2: 00/08-28-089-08 W5/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 5
Range: 08
Section: 28
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 8-28-89-8
Operator Name: Surge Energy Inc.
License Number: 0111759
License Date: 1984-12-19
License Status: Issued
Spud Date: 1984-12-30
Final Drill Date: 1985-01-22
Well Total Depth: 1407.00 m
Surface Hole Latitude: 56.745301
Surface Hole Longitude: -115.202223

For data sources see[1][2]

Well History

Date Event
1984-12-19 Obtained License
1985-01-01 Lost Circulation Occurred
1985-01-02 Lost Circulation Occurred
1985-01-04 Surface Casing Operation Performed
1985-01-06 Lost Circulation Occurred
1985-01-09 Intermediate Casing Operation Performed
1985-01-18 Drill Stem Test Performed
1985-01-22 Finished Drilling
1985-01-22 Well Mode changed to Drilled and Cased
1985-01-23 Well Log Performed
1985-01-24 Production Casing Operation Performed
1985-01-25 Rig Released
1985-02-06 Perforation Treatment Performed - Jet Perforation
1985-02-06 Well Log Performed
1985-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-22 Well Began Production
1985-02-22 Well Fluid changed to Crude Oil
1985-02-22 Well Mode changed to Pumping
1987-03-31 Well Fluid changed to Crude Oil
1987-03-31 Well Mode changed to Suspended
1989-06-29 Well Fluid changed to Crude Oil
1989-06-29 Well Mode changed to Pumping
1995-03-11 Perforation Treatment Performed - Jet Perforation
1995-03-11 Well Log Performed
1995-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-14 Plug Back Performed
1997-11-27 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-02-06 Perforation 1200.50 1202.50 13
1985-02-06 Perforation 1206.00 1208.00 13
1985-02-07 Acid Treatment 1206.00 1208.00 0
1995-03-11 Perforation 1366.50 1371.00 13
1995-03-11 Perforation 1372.50 1375.00 13
1995-03-12 Acid Treatment 1366.50 1375.00 0
1995-03-14 Packing Device Capped w/Cement 1347.50 1355.50 0
1997-11-27 Perforation 1366.50 1371.00 13
1997-11-27 Perforation 1372.50 1375.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1252 0.0 0.0 0.0
1986 1948 0.0 0.0 0.0
1989 988 0.0 0.0 0.0
1990 4746 0.0 0.0 0.0
1991 6064 0.0 0.0 0.0
1992 2394 0.0 0.0 0.0
1993 1771 0.0 0.0 0.0
1994 1504 0.0 0.0 0.0
1995 571 0.0 0.0 0.0
1997 30 0.0 0.0 0.0
1998 3037 0.0 0.0 0.0
1999 3237 0.0 0.0 0.0
2000 3652 0.0 0.0 0.0
2001 2976 0.0 0.0 0.0
2002 3940 0.0 0.0 0.0
2003 3266 0.0 0.0 0.0
2004 4647 0.0 0.0 0.0
2005 2702 0.0 0.0 0.0
2006 3255 0.0 0.0 0.0
2007 3360 0.0 0.0 0.0
2008 3398 0.0 0.0 0.0
2009 4810 0.0 0.0 0.0
2010 3689 0.0 0.0 0.0
2011 3168 0.0 0.0 0.0
2012 2327 0.0 0.0 0.0
2013 20 0.0 0.0 0.0
2014 2441 0.0 0.0 0.0
2015 2196 0.0 0.0 0.0
2016 2016 0.0 0.0 0.0
2017 3528 0.0 0.0 0.0
2018 8540 0.0 0.0 0.0
2019 4804 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-01-01 Lost Circulation 230.00 230.00
1985-01-06 Lost Circulation 481.00 481.00
1985-01-02 Lost Circulation 30.00 30.00
1997-11-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References