X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0895091210000

Well Details

Well ID: 0895091210000
Loading map...
Location: 00/10-12-089-09W5/0
Location Alias: 00/10-12-89-09 W5M
Location Alias 2: 00/10-12-089-09 W5/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 5
Range: 09
Section: 12
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 10-12-89-9
Operator Name: Surge Energy Inc.
License Number: 0430856
License Date: 2011-01-28
License Status: Issued
Spud Date: 2011-03-23
Final Drill Date: 2011-04-05
Well Total Depth: 2703.00 m
Surface Hole Latitude: 56.712375
Surface Hole Longitude: -115.306836

For data sources see[1][2]

Well History

Date Event
2011-01-28 Obtained License
2011-03-24 Surface Casing Operation Performed
2011-03-27 Direction Drilling Operation Performed - Horizontal
2011-03-29 Intermediate Casing Operation Performed
2011-03-30 Well Log Performed
2011-04-05 Finished Drilling
2011-04-05 Well Log Performed
2011-04-05 Well Mode changed to Drilled and Cased
2011-04-06 Liner Casing Operation Performed
2011-04-08 Rig Released
2011-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-04 Well Log Performed
2011-07-06 Well Began Production
2011-07-06 Well Fluid changed to Crude Oil
2011-07-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-27 986.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-05-30 Multi-Stage Fracture 2695.00 2695.10 0
2011-05-30 Multi-Stage Fracture 1787.50 1787.60 0
2011-05-30 Multi-Stage Fracture 1679.80 1679.90 0
2011-05-30 Multi-Stage Fracture 1581.80 1581.90 0
2011-05-30 Multi-Stage Fracture 1484.40 1484.50 0
2011-05-30 Multi-Stage Fracture 2585.60 2585.70 0
2011-05-30 Multi-Stage Fracture 2488.70 2488.80 0
2011-05-30 Multi-Stage Fracture 2381.00 2381.10 0
2011-05-30 Multi-Stage Fracture 2283.70 2283.80 0
2011-05-30 Multi-Stage Fracture 2189.00 2189.10 0
2011-05-30 Multi-Stage Fracture 2080.20 2080.30 0
2011-05-30 Multi-Stage Fracture 1982.60 1982.70 0
2011-05-30 Multi-Stage Fracture 1885.00 1885.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4103 0.0 0.0 0.0
2012 7649 0.0 0.0 0.0
2013 8499 0.0 0.0 0.0
2014 8176 0.0 0.0 0.0
2015 8277 0.0 0.0 0.0
2016 7649 0.0 0.0 0.0
2017 7992 0.0 0.0 0.0
2018 8538 0.0 0.0 0.0
2019 8693 0.0 0.0 0.0
2020 1943 0.0 0.0 0.0

For data sources see[6]

References