If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0904141207040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.783819,"lon":-112.075412,"icon":""}]} |
Location: 04/07-12-090-14W4/0 | |
Location Alias: 04/07-12-90-14 W4M | |
Location Alias 2: 04/07-12-090-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 090 | |
Meridian: 4 | |
Range: 14 | |
Section: 12 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: MACOP AH01I ELLS 7-12-90-14 | |
Operator Name: PetroChina Canada Ltd. | |
License Number: 0460668 | |
License Date: 2013-10-31 | |
License Status: Amended | |
Spud Date: 2014-02-07 | |
Final Drill Date: 2014-02-24 | |
Well Total Depth: 1338.00 m | |
Surface Hole Latitude: 56.783819 | |
Surface Hole Longitude: -112.075412 |
Date | Event |
---|---|
2013-10-31 | Obtained License |
2014-02-07 | Direction Drilling Operation Performed - Deviate |
2014-02-07 | Surface Casing Operation Performed |
2014-02-09 | Direction Drilling Operation Performed - Horizontal |
2014-02-10 | Intermediate Casing Operation Performed |
2014-02-15 | Well Log Performed |
2014-02-24 | Finished Drilling |
2014-02-24 | Liner Casing Operation Performed |
2014-02-24 | Rig Released |
2014-02-25 | Perforation Treatment Performed - Slotted Liner or Casing |
2014-02-25 | Well Mode changed to Drilled and Cased |
2016-12-01 | Well Began Injection |
2016-12-01 | Well Fluid changed to Steam |
2016-12-01 | Well Type changed to Injection |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-02-07 | Precision Drilling Corporation | 144 | N/A | Set Surface |
2014-02-21 | Precision Drilling Corporation | 144 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-07 | 0.00 | Deviate (5 - 79 degrees) |
2014-02-09 | 381.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-02-25 | Slotted Liner | 458.00 | 1334.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-02-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]