If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0904141303020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.790485,"lon":-112.084094,"icon":""}]} |
| Location: 02/03-13-090-14W4/0 | |
| Location Alias: 02/03-13-90-14 W4M | |
| Location Alias 2: 02/03-13-090-14 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 090 | |
| Meridian: 4 | |
| Range: 14 | |
| Section: 13 | |
| County/Municipality: Regional Municipality of Wood Buffalo | |
| Well Name: MACOP AE06I CRKD RPS 3-13-90-14 | |
| Operator Name: PetroChina Canada Ltd. | |
| License Number: 0453231 | |
| License Date: 2013-01-07 | |
| License Status: Issued | |
| Spud Date: 2013-02-02 | |
| Final Drill Date: 2013-04-08 | |
| Well Total Depth: 1366.00 m | |
| Surface Hole Latitude: 56.790485 | |
| Surface Hole Longitude: -112.084094 |
| Date | Event |
|---|---|
| 2013-01-07 | Obtained License |
| 2013-02-02 | Direction Drilling Operation Performed - Deviate |
| 2013-02-02 | Surface Casing Operation Performed |
| 2013-03-21 | Direction Drilling Operation Performed - Horizontal |
| 2013-03-23 | Intermediate Casing Operation Performed |
| 2013-04-01 | Well Log Performed |
| 2013-04-08 | Finished Drilling |
| 2013-04-08 | Liner Casing Operation Performed |
| 2013-04-08 | Perforation Treatment Performed - Slotted Liner or Casing |
| 2013-04-08 | Rig Released |
| 2013-04-08 | Well Mode changed to Drilled and Cased |
| 2017-01-01 | Well Began Injection |
| 2017-01-01 | Well Fluid changed to Steam |
| 2017-01-01 | Well Type changed to Injection |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-02-02 | Precision Drilling Corporation | 144 | N/A | Set Surface |
| 2013-04-06 | Precision Drilling Corporation | 144 | N/A | Resumption |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-02-02 | 0.00 | Deviate (5 - 79 degrees) |
| 2013-03-21 | 394.20 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-04-08 | Slotted Liner | 496.00 | 1360.00 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 0 | 0.0 | 0.0 | 0.0 |
| 2018 | 0 | 0.0 | 0.0 | 0.0 |
| 2019 | 0 | 0.0 | 0.0 | 0.0 |
| 2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-04-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]