X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0905101714002

Well Details

Well ID: 0905101714002
Loading map...
Location: 00/14-17-090-10W5/2
Location Alias: 00/14-17-90-10 W5M
Location Alias 2: 00/14-17-090-10 W5/02
Country: Canada
Province: Alberta
Township: 090
Meridian: 5
Range: 10
Section: 17
County/Municipality: Northern Sunrise County
Well Name: CARDINAL OGSTON 14-17-90-10
Operator Name: Cardinal Energy Ltd.
License Number: 0212936
License Date: 1998-02-02
License Status: Suspension
Spud Date: 1998-02-17
Final Drill Date: 1998-02-27
Well Total Depth: 1562.00 m
Surface Hole Latitude: 56.813321
Surface Hole Longitude: -115.561680

For data sources see[1][2]

Well History

Date Event
1998-02-02 Obtained License
1998-02-18 Surface Casing Operation Performed
1998-02-22 Direction Drilling Operation Performed - Deviate
1998-02-27 Finished Drilling
1998-02-27 Well Mode changed to Drilled and Cased
1998-02-28 Well Log Performed
1998-03-02 Rig Released
1998-03-11 Well Log Performed
1998-03-15 Perforation Treatment Performed - Jet Perforation
1998-03-15 Well Log Performed
1998-03-16 Well Log Performed
1998-03-17 Perforation Treatment Performed - Jet Perforation
2011-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-16 Perforation Treatment Performed - Jet Perforation
2011-12-16 Plug Back Performed
2011-12-16 Well Log Performed
2011-12-17 Perforation Treatment Performed - Fractured
2012-01-12 Well Began Production
2012-01-12 Well Fluid changed to Crude Oil
2012-01-12 Well Mode changed to Pumping
2013-04-01 Well Fluid changed to Crude Oil
2013-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-02-22 1000.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-15 Perforation 1537.80 1538.80 13
1998-03-17 Perforation 1530.00 1531.50 13
2011-12-16 Packing Device Capped w/Cement 1517.00 1525.00 0
2011-12-16 Perforation 1361.00 1364.00 20
2011-12-17 Fracture 1361.00 1364.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1404 0.0 0.0 0.0

For data sources see[6]

References