If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0914172710F10 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.924055,"lon":-112.644101,"icon":""}]} |
Location: F1/10-27-091-17W4/0 | |
Location Alias: F1/10-27-91-17 W4M | |
Location Alias 2: F1/10-27-091-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 091 | |
Meridian: 4 | |
Range: 17 | |
Section: 27 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: DOVER OPCO WSW LIEGE 10-27-91-17 | |
Operator Name: PetroChina Canada Ltd. | |
License Number: 0431719 | |
License Date: 2011-02-18 | |
License Status: Suspension | |
Spud Date: 2011-02-27 | |
Final Drill Date: 2011-03-01 | |
Well Total Depth: 162.00 m | |
Surface Hole Latitude: 56.924055 | |
Surface Hole Longitude: -112.644101 |
Date | Event |
---|---|
2011-02-18 | Obtained License |
2011-02-27 | Well Log Performed |
2011-02-27 | Well Mode changed to Drilled and Cased |
2011-02-28 | Surface Casing Operation Performed |
2011-03-01 | Finished Drilling |
2011-03-01 | Liner Casing Operation Performed |
2011-03-01 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-03-02 | Rig Released |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-01 | Slotted Liner | 94.80 | 154.00 | 0 |
For data sources see[4]