X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915060408000

Well Details

Well ID: 0915060408000
Loading map...
Location: 00/08-04-091-06W5/0
Location Alias: 00/08-04-91-06 W5M
Location Alias 2: 00/08-04-091-06 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 06
Section: 04
County/Municipality: Municipal District of Opportunity No. 17
Well Name: CARDINAL KIDNEY 8-4-91-6
Operator Name: Cardinal Energy Ltd.
License Number: 0123510
License Date: 1986-07-23
License Status: Abandoned
Spud Date: 1986-07-25
Final Drill Date: 1986-08-08
Well Total Depth: 1485.00 m
Surface Hole Latitude: 56.861952
Surface Hole Longitude: -114.894074

For data sources see[1][2]

Well History

Date Event
1986-07-23 Obtained License
1986-07-27 Surface Casing Operation Performed
1986-07-28 Lost Circulation Occurred
1986-07-31 Intermediate Casing Operation Performed
1986-08-08 Finished Drilling
1986-08-08 Well Log Performed
1986-08-08 Well Mode changed to Drilled and Cased
1986-08-09 Drill Stem Test Performed
1986-08-09 Well Log Performed
1986-08-11 Production Casing Operation Performed
1986-08-11 Rig Released
1986-08-18 Well Log Performed
1986-08-19 Perforation Treatment Performed - Jet Perforation
1986-08-19 Well Log Performed
1986-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-02 Well Began Production
1986-10-02 Well Fluid changed to Crude Oil
1986-10-02 Well Mode changed to Flowing
1989-01-12 Well Fluid changed to Crude Oil
1989-01-12 Well Mode changed to Suspended
1992-01-05 Well Fluid changed to Crude Oil
1992-01-05 Well Mode changed to Flowing
1993-05-18 Well Fluid changed to Crude Oil
1993-05-18 Well Mode changed to Pumping
1996-09-01 Well Fluid changed to Crude Oil
1996-09-01 Well Mode changed to Suspended
1998-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-26 Perforation Treatment Performed - Jet Perforation
1998-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Pumping
1998-12-21 Well Fluid changed to Crude Oil
1998-12-21 Well Mode changed to Suspended
1999-04-19 Well Fluid changed to Crude Oil
1999-04-19 Well Mode changed to Pumping
2000-11-01 Well Fluid changed to Crude Oil
2000-11-01 Well Mode changed to Suspended
2001-10-19 Plug Back Performed
2001-10-19 Well Fluid changed to Crude Oil
2001-10-19 Well Mode changed to Abandoned Zone
2001-10-21 Plug Back Performed
2001-10-23 Plug Back Performed
2001-11-02 Well Abandoned
2001-11-02 Well Fluid changed to Crude Oil
2001-11-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-08-19 Perforation 1442.50 1447.00 13
1986-08-20 Acid Treatment 1442.50 1447.00 0
1998-08-25 Packing Device Capped w/Cement 1440.00 1441.00 0
1998-08-26 Perforation 1432.00 1437.00 13
1998-08-27 Acid Treatment 1432.00 1437.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1525 0.0 0.0 0.0
1987 4172 0.0 0.0 0.0
1988 7204 0.0 0.0 0.0
1989 264 0.0 0.0 0.0
1992 5602 0.0 0.0 0.0
1993 4857 0.0 0.0 0.0
1994 8487 0.0 0.0 0.0
1995 7651 0.0 0.0 0.0
1996 5551 0.0 0.0 0.0
1998 2616 0.0 0.0 0.0
1999 1296 0.0 0.0 0.0
2000 1152 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-07-28 Lost Circulation 520.00 520.00

For data sources see[6]

References