X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915121804000

Well Details

Well ID: 0915121804000
Loading map...
Location: 00/04-18-091-12W5/0
Location Alias: 00/04-18-91-12 W5M
Location Alias 2: 00/04-18-091-12 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 12
Section: 18
County/Municipality: Northern Sunrise County
Well Name: MBOG SAWN LK 4-18-91-12
Operator Name: Surge Energy Inc.
License Number: 0120493
License Date: 1985-12-18
License Status: Issued
Spud Date: 1985-12-26
Final Drill Date: 1986-01-12
Well Total Depth: 1784.00 m
Surface Hole Latitude: 56.888770
Surface Hole Longitude: -115.930069

For data sources see[1][2]

Well History

Date Event
1985-12-18 Obtained License
1985-12-29 Surface Casing Operation Performed
1985-12-31 Drill Stem Test Performed
1986-01-05 Intermediate Casing Operation Performed
1986-01-12 Finished Drilling
1986-01-12 Well Log Performed
1986-01-12 Well Mode changed to Drilled and Cased
1986-01-14 Liner Casing Operation Performed
1986-01-14 Rig Released
1986-01-20 Well Log Performed
1986-01-24 Perforation Treatment Performed - Jet Perforation
1986-01-25 Perforation Treatment Performed - Fractured
1986-02-03 Well Began Production
1986-02-03 Well Fluid changed to Crude Oil
1986-02-03 Well Mode changed to Pumping
1997-04-17 Well Log Performed
1997-04-18 Well Log Performed
1997-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-11 Perforation Treatment Performed - Jet Perforation
1997-07-11 Plug Back Performed
1997-07-11 Well Fluid changed to Crude Oil
1997-07-11 Well Log Performed
1997-07-11 Well Mode changed to Abandoned Zone
1997-07-13 Perforation Treatment Performed - Cement Squeeze
1997-07-16 Perforation Treatment Performed - Jet Perforation
1997-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-17 Perforation Treatment Performed - Jet Perforation
1998-02-18 Perforation Treatment Performed - Jet Perforation
2001-09-30 Perforation Treatment Performed - Cement Squeeze
2001-10-13 Perforation Treatment Performed - Cement Squeeze
2001-10-13 Plug Back Performed
2001-10-17 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-24 Perforation 1600.00 1602.30 13
1997-07-16 Perforation 796.00 801.00 13
1997-07-16 Perforation 820.00 825.00 13
1997-07-17 Perforation 740.00 743.00 13
1997-07-17 Perforation 760.00 762.00 13
1997-07-17 Acid Treatment 740.00 825.00 0
1998-02-18 Perforation 747.00 754.00 13
2001-09-30 Cement Squeeze 796.00 825.00 0
2001-10-13 Cement Squeeze 740.00 775.00 0
2001-10-17 Perforation 1600.00 1602.30 13
2001-10-17 Perforation 1603.30 1605.50 13
1986-01-24 Perforation 1603.30 1605.50 13
1986-01-25 Fracture 1600.00 1605.50 0
1997-07-11 Packing Device Capped w/Cement 1587.00 1595.00 0
1997-07-11 Packing Device Capped w/Cement 1188.00 1196.00 0
1997-07-11 Perforation 835.00 836.00 13
1997-07-13 Cement Squeeze 835.00 836.00 0
1997-07-16 Perforation 762.00 765.00 13
1997-07-16 Perforation 770.00 775.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 6992 0.0 0.0 0.0
1987 7489 0.0 0.0 0.0
1988 8474 0.0 0.0 0.0
1989 8618 0.0 0.0 0.0
1990 8542 0.0 0.0 0.0
1991 8748 0.0 0.0 0.0
1992 8470 0.0 0.0 0.0
1993 7986 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8687 0.0 0.0 0.0
1996 8749 0.0 0.0 0.0
1997 8312 0.0 0.0 0.0
1998 3533 0.0 0.0 0.0
2001 1594 0.0 0.0 0.0
2002 6551 0.0 0.0 0.0

For data sources see[5]

References