X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915123102000

Well Details

Well ID: 0915123102000
Loading map...
Location: 00/02-31-091-12W5/0
Location Alias: 00/02-31-91-12 W5M
Location Alias 2: 00/02-31-091-12 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 12
Section: 31
County/Municipality: Northern Sunrise County
Well Name: MBOG SAWN LK 2-31-91-12
Operator Name: Surge Energy Inc.
License Number: 0438429
License Date: 2011-11-03
License Status: Issued
Spud Date: 2011-12-12
Final Drill Date: 2012-01-28
Well Total Depth: 3382.00 m
Surface Hole Latitude: 56.946917
Surface Hole Longitude: -115.927819

For data sources see[1][2]

Well History

Date Event
2011-11-03 Obtained License
2011-12-15 Surface Casing Operation Performed
2012-01-08 Lost Circulation Occurred
2012-01-11 Intermediate Casing Operation Performed
2012-01-14 Well Log Performed
2012-01-15 Direction Drilling Operation Performed - Horizontal
2012-01-21 Intermediate Casing Operation Performed
2012-01-22 Well Log Performed
2012-01-28 Finished Drilling
2012-01-28 Well Mode changed to Drilled and Cased
2012-02-03 Liner Casing Operation Performed
2012-02-03 Rig Released
2012-02-10 Well Log Performed
2012-02-11 Well Log Performed
2012-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-15 Perforation Treatment Performed - Open-Hole Completion
2012-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-19 Well Began Production
2012-02-19 Well Fluid changed to Crude Oil
2012-02-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-15 1246.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-15 Open Hole/Barefoot Completion 3372.00 3382.00 0
2012-02-16 Multi-Stage Fracture 2849.70 2849.80 0
2012-02-16 Multi-Stage Fracture 2788.20 2788.30 0
2012-02-16 Multi-Stage Fracture 2713.30 2713.40 0
2012-02-16 Multi-Stage Fracture 2638.30 2638.40 0
2012-02-16 Multi-Stage Fracture 2424.90 2425.00 0
2012-02-16 Multi-Stage Fracture 2350.20 2350.30 0
2012-02-16 Multi-Stage Fracture 2275.30 2275.40 0
2012-02-16 Multi-Stage Fracture 2200.40 2200.50 0
2012-02-17 Multi-Stage Fracture 2125.50 2125.60 0
2012-02-17 Multi-Stage Fracture 2050.50 2050.60 0
2012-02-15 Multi-Stage Fracture 3340.70 3340.80 0
2012-02-17 Multi-Stage Fracture 1989.10 1989.20 0
2012-02-17 Multi-Stage Fracture 1927.80 1927.90 0
2012-02-15 Multi-Stage Fracture 3279.40 3279.50 0
2012-02-15 Multi-Stage Fracture 3218.10 3218.20 0
2012-02-15 Multi-Stage Fracture 3156.70 3156.80 0
2012-02-16 Multi-Stage Fracture 3095.40 3095.50 0
2012-02-16 Multi-Stage Fracture 3033.90 3034.00 0
2012-02-16 Multi-Stage Fracture 2975.50 2975.60 0
2012-02-16 Multi-Stage Fracture 2908.10 2908.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5900 0.0 0.0 0.0
2013 7945 0.0 0.0 0.0
2014 7592 0.0 0.0 0.0
2015 8518 0.0 0.0 0.0
2016 7257 0.0 0.0 0.0
2017 8426 0.0 0.0 0.0
2018 7860 0.0 0.0 0.0
2019 8541 0.0 0.0 0.0
2020 2000 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-01-08 Lost Circulation 1019.00 1208.00

For data sources see[7]

References