X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915123207004

Well Details

Well ID: 0915123207004
Loading map...
Location: 00/07-32-091-12W5/4
Location Alias: 00/07-32-91-12 W5M
Location Alias 2: 00/07-32-091-12 W5/04
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 12
Section: 32
County/Municipality: Northern Sunrise County
Well Name: MBOG SAWN LK 2-32-91-12
Operator Name: Surge Energy Inc.
License Number: 0166405
License Date: 1994-04-13
License Status: Amended
Spud Date: 1994-04-26
Final Drill Date: 1995-01-25
Well Total Depth: 2061.00 m
Surface Hole Latitude: 56.931622
Surface Hole Longitude: -115.887967

For data sources see[1][2]

Well History

Date Event
1994-04-13 Obtained License
1994-04-29 Surface Casing Operation Performed
1994-05-08 Intermediate Casing Operation Performed
1995-01-14 Direction Drilling Operation Performed - Horizontal
1995-01-19 Liner Casing Operation Performed
1995-01-22 Direction Drilling Operation Performed - Horizontal
1995-01-25 Finished Drilling
1995-01-25 Perforation Treatment Performed - Open-Hole Completion
1995-01-25 Well Mode changed to Drilled and Cased
1995-01-27 Rig Released
1995-01-30 Well Log Performed
1995-02-04 Well Began Production
1995-02-04 Well Fluid changed to Crude Oil
1995-02-04 Well Mode changed to Pumping
1996-12-07 Well Fluid changed to Crude Oil
1996-12-07 Well Mode changed to Abandoned Zone
1996-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-09 Perforation Treatment Performed - Jet Perforation
1996-12-09 Plug Back Performed
1996-12-10 Perforation Treatment Performed - Jet Perforation
1996-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-26 Perforation Treatment Performed - Jet Perforation
2013-02-27 Perforation Treatment Performed - Jet Perforation
2013-02-27 Well Log Performed
2013-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-07-19 Perforation Treatment Performed - Cement Squeeze
2019-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-20 Perforation Treatment Performed - Cement Plug
2019-07-20 Perforation Treatment Performed - Jet Perforation
2019-07-20 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-01-14 1415.00 Horizontal
1995-01-22 1689.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-25 Open Hole/Barefoot Completion 1669.00 2061.00 0
2013-02-26 Perforation 782.00 791.00 13
2013-02-27 Perforation 973.00 985.00 20
2013-02-27 Perforation 735.00 745.00 17
2013-03-02 Acid Treatment 973.00 985.00 0
2013-03-07 Acid Treatment 727.00 791.00 0
2019-07-19 Cement Squeeze 727.00 791.00 0
2019-07-20 Packing Device Capped w/Cement 708.00 718.00 0
2019-07-20 Perforation 669.00 675.00 17
2019-07-20 Cement Plug 653.00 675.00 0
1996-12-09 Packing Device Capped w/Cement 1140.00 1148.00 0
1996-12-09 Perforation 727.00 735.00 13
1996-12-10 Perforation 763.00 772.00 13
1996-12-10 Perforation 782.00 791.00 13
1996-12-12 Acid Treatment 727.00 791.00 0
2011-02-19 Packing Device Capped w/Cement 711.00 719.00 0
2013-02-26 Perforation 727.00 735.00 13
2013-02-26 Perforation 763.00 772.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 5925 0.0 0.0 0.0
1996 4601 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-04-01 No Incident Encountered 0.00 0.00
2019-08-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References