X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915131209000

Well Details

Well ID: 0915131209000
Loading map...
Location: 00/09-12-091-13W5/0
Location Alias: 00/09-12-91-13 W5M
Location Alias 2: 00/09-12-091-13 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 13
Section: 12
County/Municipality: Northern Sunrise County
Well Name: MBOG SAWN LK 9-12-91-13
Operator Name: Surge Energy Inc.
License Number: 0109396
License Date: 1984-09-20
License Status: Issued
Spud Date: 1984-09-25
Final Drill Date: 1984-10-11
Well Total Depth: 1790.00 m
Surface Hole Latitude: 56.882804
Surface Hole Longitude: -115.938045

For data sources see[1][2]

Well History

Date Event
1984-09-20 Obtained License
1984-09-26 Lost Circulation Occurred
1984-09-27 Surface Casing Operation Performed
1984-09-30 Drill Stem Test Performed
1984-09-30 Lost Circulation Occurred
1984-10-11 Finished Drilling
1984-10-11 Well Log Performed
1984-10-12 Production Casing Operation Performed
1984-10-13 Rig Released
1984-10-13 Well Mode changed to Drilled and Cased
1984-10-25 Well Log Performed
1984-10-26 Perforation Treatment Performed - Jet Perforation
1984-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-29 Perforation Treatment Performed - Jet Perforation
1984-10-29 Plug Back Performed
1984-10-30 Perforation Treatment Performed - Fractured
1984-11-07 Well Began Production
1984-11-07 Well Fluid changed to Crude Oil
1984-11-07 Well Mode changed to Flowing
1990-02-13 Well Fluid changed to Crude Oil
1990-02-13 Well Mode changed to Pumping
1993-06-26 Well Log Performed
1993-06-27 Perforation Treatment Performed - Jet Perforation
1993-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-26 Perforation 1768.30 1771.30 13
1984-10-29 Packing Device Capped w/Cement 1752.00 1760.00 0
1984-10-29 Perforation 1609.30 1617.00 13
1984-10-30 Fracture 1609.30 1617.00 0
1993-06-27 Perforation 1617.90 1622.10 13
1993-06-27 Perforation 1627.60 1628.70 13
1993-06-28 Acid Treatment 1609.30 1628.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1278 0.0 0.0 0.0
1985 8103 0.0 0.0 0.0
1986 8296 0.0 0.0 0.0
1987 8504 0.0 0.0 0.0
1988 8539 0.0 0.0 0.0
1989 8027 0.0 0.0 0.0
1990 8449 0.0 0.0 0.0
1991 7959 0.0 0.0 0.0
1992 8162 0.0 0.0 0.0
1993 8037 0.0 0.0 0.0
1994 8051 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8724 0.0 0.0 0.0
1997 8467 0.0 0.0 0.0
1998 8487 0.0 0.0 0.0
1999 8589 0.0 0.0 0.0
2000 8755 0.0 0.0 0.0
2001 8375 0.0 0.0 0.0
2002 8574 0.0 0.0 0.0
2003 8341 0.0 0.0 0.0
2004 8056 0.0 0.0 0.0
2005 8114 0.0 0.0 0.0
2006 7981 0.0 0.0 0.0
2007 8427 0.0 0.0 0.0
2008 7865 0.0 0.0 0.0
2009 6706 0.0 0.0 0.0
2010 7098 0.0 0.0 0.0
2011 6594 0.0 0.0 0.0
2012 7500 0.0 0.0 0.0
2013 7897 0.0 0.0 0.0
2014 8477 0.0 0.0 0.0
2015 8239 0.0 0.0 0.0
2016 8000 0.0 0.0 0.0
2017 7902 0.0 0.0 0.0
2018 8547 0.0 0.0 0.0
2019 8424 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-09-26 Lost Circulation 162.00 206.00
1984-09-30 Lost Circulation 799.00 1258.00

For data sources see[6]

References