X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915132503000

Well Details

Well ID: 0915132503000
Loading map...
Location: 00/03-25-091-13W5/0
Location Alias: 00/03-25-91-13 W5M
Location Alias 2: 00/03-25-091-13 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 13
Section: 25
County/Municipality: Northern Sunrise County
Well Name: MBOG SAWN LK 3-25-91-13
Operator Name: Surge Energy Inc.
License Number: 0438079
License Date: 2011-10-27
License Status: Issued
Spud Date: 2012-01-27
Final Drill Date: 2012-02-25
Well Total Depth: 3226.00 m
Surface Hole Latitude: 56.932316
Surface Hole Longitude: -115.948010

For data sources see[1][2]

Well History

Date Event
2011-10-27 Obtained License
2012-01-29 Surface Casing Operation Performed
2012-02-16 Intermediate Casing Operation Performed
2012-02-17 Direction Drilling Operation Performed - Horizontal
2012-02-18 Well Log Performed
2012-02-21 Intermediate Casing Operation Performed
2012-02-22 Well Log Performed
2012-02-25 Finished Drilling
2012-02-25 Well Mode changed to Drilled and Cased
2012-02-28 Liner Casing Operation Performed
2012-02-28 Well Log Performed
2012-02-29 Rig Released
2012-03-14 Well Log Performed
2012-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-17 Perforation Treatment Performed - Open-Hole Completion
2012-05-09 Well Began Production
2012-05-09 Well Fluid changed to Crude Oil
2012-05-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-27 Savanna Drilling Corp. 623 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-17 1331.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-17 Open Hole/Barefoot Completion 3222.00 3226.00 0
2012-03-17 Multi-Stage Fracture 2635.20 2635.30 0
2012-03-17 Multi-Stage Fracture 2565.50 2565.60 0
2012-03-17 Multi-Stage Fracture 2495.60 2495.70 0
2012-03-17 Multi-Stage Fracture 2425.60 2425.70 0
2012-03-17 Multi-Stage Fracture 2342.90 2343.00 0
2012-03-17 Multi-Stage Fracture 2273.00 2273.10 0
2012-03-17 Multi-Stage Fracture 2203.20 2203.30 0
2012-03-17 Multi-Stage Fracture 2133.40 2133.50 0
2012-03-17 Multi-Stage Fracture 2064.80 2064.90 0
2012-03-17 Multi-Stage Fracture 1995.00 1995.10 0
2012-03-17 Multi-Stage Fracture 3200.20 3200.30 0
2012-03-17 Multi-Stage Fracture 1913.10 1913.20 0
2012-03-17 Multi-Stage Fracture 1843.30 1843.40 0
2012-03-17 Multi-Stage Fracture 3136.40 3136.50 0
2012-03-17 Multi-Stage Fracture 3066.70 3066.80 0
2012-03-17 Multi-Stage Fracture 2984.30 2984.40 0
2012-03-17 Multi-Stage Fracture 2914.50 2914.60 0
2012-03-17 Multi-Stage Fracture 2844.60 2844.70 0
2012-03-17 Multi-Stage Fracture 2774.80 2774.90 0
2012-03-17 Multi-Stage Fracture 2705.00 2705.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5386 0.0 0.0 0.0
2013 8197 0.0 0.0 0.0
2014 8423 0.0 0.0 0.0
2015 8067 0.0 0.0 0.0
2016 8290 0.0 0.0 0.0
2017 8562 0.0 0.0 0.0
2018 7883 0.0 0.0 0.0
2019 8633 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References