X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915132601000

Well Details

Well ID: 0915132601000
Loading map...
Location: 00/01-26-091-13W5/0
Location Alias: 00/01-26-91-13 W5M
Location Alias 2: 00/01-26-091-13 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 13
Section: 26
County/Municipality: Northern Sunrise County
Well Name: MBOG SAWN LK 1-26-91-13
Operator Name: Surge Energy Inc.
License Number: 0422293
License Date: 2010-07-29
License Status: Issued
Spud Date: 2011-01-29
Final Drill Date: 2011-02-19
Well Total Depth: 3085.00 m
Surface Hole Latitude: 56.930400
Surface Hole Longitude: -115.959951

For data sources see[1][2]

Well History

Date Event
2010-07-29 Obtained License
2011-01-30 Lost Circulation Occurred
2011-02-02 Surface Casing Operation Performed
2011-02-06 Direction Drilling Operation Performed - Horizontal
2011-02-06 Well Log Performed
2011-02-11 Intermediate Casing Operation Performed
2011-02-11 Well Log Performed
2011-02-19 Finished Drilling
2011-02-19 Well Mode changed to Drilled and Cased
2011-02-21 Liner Casing Operation Performed
2011-02-22 Rig Released
2011-02-25 Well Log Performed
2011-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-27 Perforation Treatment Performed - Open-Hole Completion
2011-04-02 Well Began Production
2011-04-02 Well Fluid changed to Crude Oil
2011-04-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-06 1340.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-27 Open Hole/Barefoot Completion 3050.30 3085.00 0
2011-02-27 Multi-Stage Fracture 2497.40 2498.80 0
2011-02-27 Multi-Stage Fracture 2421.50 2422.90 0
2011-02-27 Multi-Stage Fracture 2359.40 2361.00 0
2011-02-27 Multi-Stage Fracture 2283.60 2285.00 0
2011-02-27 Multi-Stage Fracture 2221.40 2222.80 0
2011-02-27 Multi-Stage Fracture 2145.60 2147.00 0
2011-02-27 Multi-Stage Fracture 2083.40 2084.90 0
2011-02-27 Multi-Stage Fracture 2007.60 2009.10 0
2011-02-27 Multi-Stage Fracture 1945.70 1947.10 0
2011-02-27 Multi-Stage Fracture 1871.90 1873.30 0
2011-02-27 Multi-Stage Fracture 3046.00 3047.10 0
2011-02-27 Multi-Stage Fracture 1809.80 1811.20 0
2011-02-27 Multi-Stage Fracture 1737.50 1738.90 0
2011-02-27 Multi-Stage Fracture 2971.90 2973.30 0
2011-02-27 Multi-Stage Fracture 2911.10 2912.50 0
2011-02-27 Multi-Stage Fracture 2836.90 2838.30 0
2011-02-27 Multi-Stage Fracture 2776.00 2777.50 0
2011-02-27 Multi-Stage Fracture 2700.90 2702.30 0
2011-02-27 Multi-Stage Fracture 2631.20 2632.60 0
2011-02-27 Multi-Stage Fracture 2559.50 2560.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5379 0.0 0.0 0.0
2012 6808 0.0 0.0 0.0
2013 7157 0.0 0.0 0.0
2014 7959 0.0 0.0 0.0
2015 8293 0.0 0.0 0.0
2016 8310 0.0 0.0 0.0
2017 8686 0.0 0.0 0.0
2018 8387 0.0 0.0 0.0
2019 8731 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-01-30 Lost Circulation 167.00 297.00

For data sources see[7]

References