X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0925040914000

Well Details

Well ID: 0925040914000
Loading map...
Location: 00/14-09-092-04W5/0
Location Alias: 00/14-09-92-04 W5M
Location Alias 2: 00/14-09-092-04 W5/00
Country: Canada
Province: Alberta
Township: 092
Meridian: 5
Range: 04
Section: 09
County/Municipality: Municipal District of Opportunity No. 17
Well Name: CARDINAL KIDNEY 14-9-92-4
Operator Name: Cardinal Energy Ltd.
License Number: 0126648
License Date: 1987-05-28
License Status: Abandoned
Spud Date: 1987-06-09
Final Drill Date: 1987-06-24
Well Total Depth: 1323.00 m
Surface Hole Latitude: 56.971375
Surface Hole Longitude: -114.582669

For data sources see[1][2]

Well History

Date Event
1987-05-28 Obtained License
1987-06-11 Surface Casing Operation Performed
1987-06-13 Kick Occurred
1987-06-13 Lost Circulation Occurred
1987-06-15 Intermediate Casing Operation Performed
1987-06-24 Finished Drilling
1987-06-24 Well Log Performed
1987-06-25 Drill Stem Test Performed
1987-06-25 Well Log Performed
1987-06-26 Drill Stem Test Performed
1987-06-27 Liner Casing Operation Performed
1987-06-27 Rig Released
1987-06-27 Well Mode changed to Drilled and Cased
1988-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-12 Perforation Treatment Performed - Jet Perforation
1988-07-10 Well Log Performed
1993-10-01 Well Began Injection
1993-10-01 Well Fluid changed to Water
1993-10-01 Well Type changed to Disposal
1995-12-30 Well Fluid changed to Water
1995-12-30 Well Mode changed to Suspended
1995-12-30 Well Type changed to Disposal
2003-11-30 Perforation Treatment Performed - Cement Plug
2003-11-30 Plug Back Performed
2003-12-05 Well Log Performed
2003-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-07 Perforation Treatment Performed - Jet Perforation
2003-12-07 Plug Back Performed
2003-12-07 Well Fluid changed to Water
2003-12-07 Well Mode changed to Abandoned Zone
2003-12-07 Well Type changed to Disposal
2003-12-08 Perforation Treatment Performed - Remedial Casing
2003-12-08 Well Log Performed
2003-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-10 Plug Back Performed
2003-12-31 Well Abandoned
2003-12-31 Well Fluid changed to Water
2003-12-31 Well Mode changed to Abandoned
2003-12-31 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-04-12 Perforation 685.00 691.00 13
1988-04-12 Acid Treatment 685.00 691.00 0
2003-11-30 Cement Plug 595.40 647.90 0
2003-12-07 Packing Device Capped w/Cement 437.50 446.00 0
2003-12-07 Perforation 414.00 414.60 24
2003-12-08 Remedial Casing Cementing 414.00 414.60 0
2003-12-10 Packing Device Capped w/Cement 363.00 409.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-06-13 Lost Circulation 529.00 529.00
1987-06-13 Kick 618.00 618.00

For data sources see[6]

References