If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0925043506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":57.02255,"lon":-114.530322,"icon":""}]} |
Location: 00/06-35-092-04W5/0 | |
Location Alias: 00/06-35-92-04 W5M | |
Location Alias 2: 00/06-35-092-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 092 | |
Meridian: 5 | |
Range: 04 | |
Section: 35 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: PRED SENEX 6-35-92-4 | |
Operator Name: Highwood Oil Company Ltd. | |
License Number: 0036828 | |
License Date: 1969-09-11 | |
License Status: Abandoned | |
Spud Date: 1969-12-11 | |
Final Drill Date: 1969-12-30 | |
Well Total Depth: 1269.80 m | |
Surface Hole Latitude: 57.022550 | |
Surface Hole Longitude: -114.530322 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1969-09-11 | Obtained License |
1969-12-25 | Intermediate Casing Operation Performed |
1969-12-30 | Finished Drilling |
1969-12-30 | Well Mode changed to Drilled and Cased |
1970-01-02 | Perforation Treatment Performed - Open-Hole Completion |
1970-02-02 | Well Began Production |
1970-02-02 | Well Fluid changed to Crude Oil |
1970-02-02 | Well Mode changed to Flowing |
1971-08-01 | Well Fluid changed to Crude Oil |
1971-08-01 | Well Mode changed to Suspended |
1974-01-25 | Well Fluid changed to Crude Oil |
1974-01-25 | Well Mode changed to Pumping |
1974-04-01 | Well Fluid changed to Crude Oil |
1974-04-01 | Well Mode changed to Suspended |
1974-12-01 | Well Fluid changed to Crude Oil |
1974-12-01 | Well Mode changed to Pumping |
1975-05-01 | Well Fluid changed to Crude Oil |
1975-05-01 | Well Mode changed to Suspended |
1978-01-18 | Well Fluid changed to Crude Oil |
1978-01-18 | Well Mode changed to Pumping |
1980-03-01 | Perforation Treatment Performed - Open-Hole Completion |
1980-03-01 | Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug |
1980-03-02 | Perforation Treatment Performed - Fractured |
1980-12-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-11-15 | Well Fluid changed to Crude Oil |
1982-11-15 | Well Mode changed to Suspended |
1988-08-25 | Well Fluid changed to Crude Oil |
1988-08-25 | Well Mode changed to Pumping |
1994-03-01 | Well Fluid changed to Crude Oil |
1994-03-01 | Well Mode changed to Suspended |
2002-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-12 | Plug Back Performed |
2002-02-12 | Well Fluid changed to Crude Oil |
2002-02-12 | Well Mode changed to Abandoned Zone |
2002-02-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-13 | Plug Back Performed |
2002-02-13 | Well Abandoned |
2002-02-13 | Well Fluid changed to Crude Oil |
2002-02-13 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1970-01-02 | Open Hole/Barefoot Completion | 1246.60 | 1269.80 | 0 |
1980-03-01 | Resin-Gypsum Squeeze or Plug | 1263.30 | 1269.80 | 0 |
1980-03-01 | Open Hole/Barefoot Completion | 1246.60 | 1263.30 | 0 |
1980-03-02 | Fracture | 1246.60 | 1263.30 | 0 |
1980-12-14 | Acid Treatment | 1246.60 | 1263.30 | 0 |
2002-02-12 | Packing Device Capped w/Cement | 1233.40 | 1241.40 | 0 |
2002-02-13 | Packing Device Capped w/Cement | 954.00 | 962.00 | 0 |
2002-02-13 | Packing Device Capped w/Cement | 393.10 | 401.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1970 | 1756 | 0.0 | 0.0 | 0.0 |
1971 | 1454 | 0.0 | 0.0 | 0.0 |
1975 | 1360 | 0.0 | 0.0 | 0.0 |
1978 | 1164 | 0.0 | 0.0 | 0.0 |
1979 | 5064 | 0.0 | 0.0 | 0.0 |
1980 | 4796 | 0.0 | 0.0 | 0.0 |
1981 | 7296 | 0.0 | 0.0 | 0.0 |
1982 | 5712 | 0.0 | 0.0 | 0.0 |
1988 | 1632 | 0.0 | 0.0 | 0.0 |
1989 | 3703 | 0.0 | 0.0 | 0.0 |
1990 | 6477 | 0.0 | 0.0 | 0.0 |
1991 | 8311 | 0.0 | 0.0 | 0.0 |
1992 | 8471 | 0.0 | 0.0 | 0.0 |
1993 | 1728 | 0.0 | 0.0 | 0.0 |
For data sources see[5]