X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0945250809000

Well Details

Well ID: 0945250809000
Loading map...
Location: 00/09-08-094-25W5/0
Location Alias: 00/09-08-94-25 W5M
Location Alias 2: 00/09-08-094-25 W5/00
Country: Canada
Province: Alberta
Township: 094
Meridian: 5
Range: 25
Section: 08
County/Municipality: County of Northern Lights
Well Name: SYDCO HOTCHKIS 9-8-94-25
Operator Name: Sydco Energy Inc.
License Number: 0198864
License Date: 1997-03-03
License Status: Issued
Spud Date: 1997-03-04
Final Drill Date: 1997-03-07
Well Total Depth: 669.00 m
Surface Hole Latitude: 57.144198
Surface Hole Longitude: -117.978966

For data sources see[1][2]

Well History

Date Event
1997-03-03 Obtained License
1997-03-05 Surface Casing Operation Performed
1997-03-07 Finished Drilling
1997-03-07 Production Casing Operation Performed
1997-03-07 Well Log Performed
1997-03-07 Well Mode changed to Drilled and Cased
1997-03-08 Rig Released
1997-03-09 Perforation Treatment Performed - Jet Perforation
1997-03-09 Well Log Performed
1997-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-14 Well Log Performed
1997-03-24 Well Began Production
1997-03-24 Well Fluid changed to Gas
1997-03-24 Well Mode changed to Flowing
1997-04-10 Well Log Performed
1997-04-13 Perforation Treatment Performed - Cement Squeeze
1997-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-14 Perforation Treatment Performed - Jet Perforation
1997-04-15 Well Log Performed
2012-05-31 Well Fluid changed to Gas
2012-05-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-09 Perforation 621.50 623.50 13
1997-03-09 Perforation 627.00 632.00 13
1997-03-09 Perforation 636.00 638.00 13
1997-03-09 Perforation 647.00 649.00 13
1997-03-12 Acid Treatment 621.50 649.00 0
1997-04-13 Cement Squeeze 636.00 649.00 0
1997-04-14 Perforation 621.50 623.50 13
1997-04-14 Perforation 627.00 632.00 13
1997-04-14 Acid Treatment 621.50 632.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4150 0.0 0.0 0.0
1998 7504 0.0 0.0 0.0
1999 7417 0.0 0.0 0.0
2000 2164 0.0 0.0 0.0
2001 6357 0.0 0.0 0.0
2002 8387 0.0 0.0 0.0
2003 8678 0.0 0.0 0.0
2004 7672 0.0 0.0 0.0
2005 7122 0.0 0.0 0.0
2006 6464 0.0 0.0 0.0
2007 4555 0.0 0.0 0.0
2008 5871 0.0 0.0 0.0
2009 5034 0.0 0.0 0.0
2010 102 0.0 0.0 0.0
2011 6189 0.0 0.0 0.0
2012 1881 0.0 0.0 0.0

For data sources see[5]

References