X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0945253610002

Well Details

Well ID: 0945253610002
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/10-36-094-25W5/2
Location Alias: 00/10-36-94-25 W5M
Location Alias 2: 00/10-36-094-25 W5/02
Country: Canada
Province: Alberta
Township: 094
Meridian: 5
Range: 25
Section: 36
County/Municipality: County of Northern Lights
Well Name: SYDCO HOTCHKIS 10-36-94-25
Operator Name: Sydco Energy Inc.
License Number: 0080238
License Date: 1980-01-04
License Status: Abandoned
Spud Date: 1980-01-27
Final Drill Date: 1980-01-29
Well Total Depth: 706.00 m
Surface Hole Latitude: 57.200068
Surface Hole Longitude: -117.879245

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-04 Obtained License
1980-01-29 Finished Drilling
1980-01-29 Well Mode changed to Drilled and Cased
1980-02-01 Production Casing Operation Performed
1980-02-25 Perforation Treatment Performed - Jet Perforation
1980-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-27 Perforation Treatment Performed - Jet Perforation
1980-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-01 Well Began Production
1980-03-01 Well Fluid changed to Gas
1980-03-01 Well Mode changed to Flowing
1984-09-01 Well Structure changed to Commingled
1988-01-16 Perforation Treatment Performed - Cement Squeeze
1988-01-19 Perforation Treatment Performed - Jet Perforation
1988-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-11 Plug Back Performed
2007-02-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-25 Perforation 672.50 674.00 7
1980-02-26 Acid Treatment 672.50 674.00 0
1980-02-27 Perforation 665.00 666.00 7
1980-02-27 Perforation 659.00 661.00 7
1980-02-28 Acid Treatment 659.00 666.00 0
1988-01-16 Cement Squeeze 672.50 674.00 0
1988-01-19 Perforation 658.50 661.00 13
1988-01-20 Acid Treatment 658.50 666.00 0
2007-02-11 Packing Device Capped w/Cement 632.00 647.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1741 0.0 0.0 0.0
1981 6554 0.0 0.0 0.0
1982 4697 0.0 0.0 0.0
1983 3141 0.0 0.0 0.0
1984 2313 0.0 0.0 0.0

For data sources see[5]

References

BESbswy