If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0994150103AA0 | |
Location: AA/03-01-099-15W4/0 | |
Location Alias: AA/03-01-99-15 W4M | |
Location Alias 2: AA/03-01-099-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 099 | |
Meridian: 4 | |
Range: 15 | |
Section: 01 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: AOSC TAR 3-1-99-15 | |
Operator Name: Athabasca Oil Corporation | |
License Number: 0442164 | |
License Date: 2012-01-03 | |
License Status: RecCertified | |
Spud Date: 2012-01-24 | |
Final Drill Date: 2012-01-28 | |
Well Total Depth: 543.50 m | |
Surface Hole Latitude: 57.557109 | |
Surface Hole Longitude: -112.320991 |
Date | Event |
---|---|
2012-01-03 | Obtained License |
2012-01-24 | Surface Casing Operation Performed |
2012-01-27 | Well Log Performed |
2012-01-28 | Finished Drilling |
2012-01-28 | Production Casing Operation Performed |
2012-01-28 | Rig Released |
2012-01-28 | Well Log Performed |
2012-01-28 | Well Mode changed to Drilled and Cased |
2012-02-28 | Perforation Treatment Performed - Jet Perforation |
2012-02-29 | Perforation Treatment Performed - Jet Perforation |
2012-03-01 | Perforation Treatment Performed - Jet Perforation |
2012-03-02 | Perforation Treatment Performed - Cement Plug |
2012-03-02 | Perforation Treatment Performed - Jet Perforation |
2012-03-02 | Plug Back Performed |
2012-03-04 | Perforation Treatment Performed - Cement Squeeze |
2012-03-04 | Perforation Treatment Performed - Jet Perforation |
2012-03-04 | Plug Back Performed |
2012-03-06 | Perforation Treatment Performed - Cement Plug |
2012-03-06 | Perforation Treatment Performed - Cement Squeeze |
2012-03-06 | Perforation Treatment Performed - Jet Perforation |
2012-03-06 | Plug Back Performed |
2012-03-06 | Well Mode changed to Abandoned Zone |
2012-03-13 | Well Abandoned |
2012-03-13 | Well Mode changed to Abandoned |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-24 | Precision Drilling Corporation | 133 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-28 | Perforation | 499.30 | 499.80 | 17 |
2012-03-04 | Perforation | 148.00 | 211.00 | 1 |
2012-03-04 | Cement Squeeze | 148.00 | 211.00 | 0 |
2012-03-06 | Perforation | 145.00 | 145.50 | 13 |
2012-03-06 | Perforation | 4.00 | 145.50 | 1 |
2012-03-06 | Cement Squeeze | 4.00 | 145.50 | 0 |
2012-03-06 | Cement Plug | 4.00 | 180.00 | 0 |
2012-02-29 | Perforation | 491.80 | 492.30 | 17 |
2012-02-29 | Perforation | 478.30 | 478.80 | 17 |
2012-03-01 | Perforation | 466.80 | 467.30 | 17 |
2012-03-01 | Perforation | 446.30 | 446.80 | 17 |
2012-03-02 | Perforation | 171.30 | 171.80 | 17 |
2012-03-02 | Cement Plug | 180.00 | 538.10 | 0 |
2012-03-04 | Perforation | 171.30 | 171.80 | 17 |
2012-03-04 | Perforation | 170.80 | 171.30 | 17 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-02-28 | No Incident Encountered | 0.00 | 0.00 |
2012-02-29 | No Incident Encountered | 0.00 | 0.00 |
2012-03-01 | No Incident Encountered | 0.00 | 0.00 |
2012-03-02 | No Incident Encountered | 0.00 | 0.00 |
2012-03-04 | No Incident Encountered | 0.00 | 0.00 |
2012-03-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]