If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0996080506002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":57.561584,"lon":-119.269314,"icon":""}]} |
Location: 00/06-05-099-08W6/2 | |
Location Alias: 00/06-05-99-08 W6M | |
Location Alias 2: 00/06-05-099-08 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 099 | |
Meridian: 6 | |
Range: 08 | |
Section: 05 | |
County/Municipality: County of Northern Lights | |
Well Name: NUVISTA SNOWFALL 7-5-99-8 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0252517 | |
License Date: 2001-03-05 | |
License Status: Suspension | |
Spud Date: 2001-12-17 | |
Final Drill Date: 2002-01-27 | |
Well Total Depth: 2394.00 m | |
Surface Hole Latitude: 57.561584 | |
Surface Hole Longitude: -119.269314 |
Date | Event |
---|---|
2001-03-05 | Obtained License |
2002-01-16 | Direction Drilling Operation Performed - Deviate |
2002-01-27 | Finished Drilling |
2002-01-28 | Well Log Performed |
2002-02-03 | Production Casing Operation Performed |
2002-02-03 | Rig Released |
2002-02-03 | Well Mode changed to Drilled and Cased |
2002-02-15 | Perforation Treatment Performed - Jet Perforation |
2002-02-17 | Perforation Treatment Performed - Fractured |
2002-05-17 | Well Began Production |
2002-05-17 | Well Fluid changed to Gas |
2002-05-17 | Well Mode changed to Flowing |
2004-03-01 | Well Fluid changed to Gas |
2004-03-01 | Well Mode changed to Suspended |
2019-02-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-02-24 | Plug Back Performed |
2019-02-24 | Well Fluid changed to Gas |
2019-02-24 | Well Mode changed to Abandoned Zone |
2020-01-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2020-01-09 | Perforation Treatment Performed - Jet Perforation |
2020-01-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-01-12 | Plug Back Performed |
2020-01-13 | Perforation Treatment Performed - Jet Perforation |
2020-01-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2020-01-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-01-16 | Perforation Treatment Performed - Jet Perforation |
2020-01-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-01-23 | Perforation Treatment Performed - Remedial Casing |
2020-01-23 | Plug Back Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2002-01-16 | 1375.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-02-15 | Perforation | 2349.00 | 2357.00 | 20 |
2020-01-16 | Perforation | 1026.50 | 1028.50 | 20 |
2020-01-16 | Perforation | 992.00 | 993.00 | 20 |
2020-01-16 | Perforation | 859.00 | 860.00 | 20 |
2020-01-16 | Perforation | 819.00 | 820.00 | 20 |
2020-01-23 | Remedial Casing Cementing | 1026.50 | 1028.50 | 0 |
2020-01-23 | Remedial Casing Cementing | 992.00 | 993.00 | 0 |
2020-01-23 | Remedial Casing Cementing | 859.00 | 860.00 | 0 |
2020-01-23 | Remedial Casing Cementing | 819.00 | 820.00 | 0 |
2020-01-23 | Packing Device Capped w/Cement | 800.00 | 986.90 | 0 |
2002-02-17 | Fracture | 2349.00 | 2357.00 | 0 |
2019-02-24 | Packing Device Capped w/Cement | 2286.90 | 2342.00 | 0 |
2020-01-09 | Perforation | 1715.00 | 1717.00 | 20 |
2020-01-09 | Acid Treatment | 1715.00 | 1717.00 | 0 |
2020-01-12 | Packing Device Capped w/Cement | 1705.00 | 1713.00 | 0 |
2020-01-13 | Perforation | 1309.00 | 1311.00 | 20 |
2020-01-14 | Acid Treatment | 1309.00 | 1311.00 | 0 |
2020-01-14 | Packing Device Capped w/Cement | 1288.00 | 1302.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 1195 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-02-27 | No Incident Encountered | 0.00 | 0.00 |
2020-01-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]