If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.01-08-009-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.72620374,"lon":-101.25768425,"icon":""}]} |
Well Name: Corex Daly Sinclair HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 009 | |
Meridian: W1 | |
Range: 28 | |
Section: 08 | |
Division: Division No. 6 | |
Subdivision: Pipestone | |
Operator Name: Corex Resources Ltd. | |
License Status: Capable Of Oil Production | |
Spud Date: 2010-06-20 | |
License Date: 2010-08-12 | |
Well Total Depth: 2269.00 | |
Latitude: 49.72620374 | |
Longitude: -101.25768425 |
For data sources see[1]
Date | Event |
---|---|
2010-08-12 | Location |
2010-08-30 | Running Casing |
2010-09-06 | Drilling Ahead |
2010-09-09 | Waiting On Service Rig |
2010-09-15 | Completing |
2010-09-30 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2010-06-20 | Akita Drilling Ltd. | 55 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2010-09-17 | HOLLOW STEEL CARRIER | 2217.00 | 2217.50 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 2162.52 | 2163.02 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 2107.45 | 2107.95 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 2052.54 | 2053.05 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 2002.03 | 2002.53 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1946.89 | 1947.39 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1891.79 | 1892.29 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1837.32 | 1837.82 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1782.37 | 1782.87 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1671.01 | 1671.51 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1615.81 | 1616.31 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1560.68 | 1561.18 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1505.57 | 1506.07 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1451.57 | 1452.07 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1396.41 | 1396.91 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1341.30 | 1341.80 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1286.21 | 1286.71 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1231.01 | 1231.51 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1175.72 | 1176.22 | 17 | N/A | 2011-04-12 |
2010-09-17 | HOLLOW STEEL CARRIER | 1120.36 | 1120.86 | 17 | N/A | 2011-04-12 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 2.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2010-09-20 | FRAC | N/A | 20/40 | SAND | 4.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Corex Resources Ltd. | 702.00 | 0 | 0.00 |
2015 | Corex Resources Ltd. | 46.60 | 0 | 0.00 |
2016 | Corex Resources Ltd. | 0.00 | 0 | 0.00 |
2017 | Corex Resources Ltd. | 0.00 | 0 | 0.00 |
2018 | Corex Resources Ltd. | 0.00 | 0 | 0.00 |
2019 | Corex Resources Ltd. | 0.00 | 0 | 0.00 |
2020 | Corex Resources Ltd. | 0.00 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Corex Resources Ltd. | 7,208.30 | 316 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Corex Resources Ltd. | 4,185.40 | 129 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Corex Resources Ltd. | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Corex Resources Ltd. | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Corex Resources Ltd. | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Corex Resources Ltd. | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Corex Resources Ltd. | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]