If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.02-02-013-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.07787245,"lon":-101.20512956,"icon":""}]} |
Well Name: East Manson Unit No. 7 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 013 | |
Meridian: W1 | |
Range: 28 | |
Section: 02 | |
Division: Division No. 15 | |
Subdivision: Ellice-Archie | |
Operator Name: TORC Oil & Gas Ltd. | |
License Status: Capable Of Oil Production | |
Spud Date: 2013-03-05 | |
License Date: 2013-02-01 | |
Well Total Depth: 2012.00 | |
Latitude: 50.07787245 | |
Longitude: -101.20512956 |
For data sources see[1]
Date | Event |
---|---|
2013-02-01 | Location |
2013-03-11 | Drilling Ahead |
2013-03-16 | Waiting On Service Rig |
2013-05-25 | Completing |
2013-08-18 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2013-03-05 | Alliance Drilling | 5 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2013-06-03 | 825.00 | 826.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 905.00 | 906.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 980.00 | 981.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1052.00 | 1053.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1132.00 | 1133.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1205.00 | 1206.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1290.00 | 1291.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1355.00 | 1356.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1428.00 | 1429.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1500.00 | 1501.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1575.00 | 1576.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1655.00 | 1656.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1730.00 | 1731.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1803.00 | 1804.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1877.00 | 1878.00 | 17 | N/A | 2017-03-30 | |
2013-06-03 | 1950.00 | 1951.00 | 17 | N/A | 2017-03-30 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | 3.0 |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | N/A |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | N/A |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | 3.0 |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | N/A |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | N/A |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | N/A |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | 3.0 |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | 2.4 |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | 0.0 |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | 3.0 |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | 3.0 |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | 3.0 |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | 3.0 |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | N/A |
2013-03-16 | FRAC | 15% HCl | N/A | 20:40 | SAND | N/A |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Crescent Point Energy Corp. | 791.10 | 0 | 0.00 |
2015 | Crescent Point Energy Corp. | 603.50 | 0 | 0.00 |
2016 | Crescent Point Energy Corp. | 316.90 | 0 | 0.00 |
2017 | TORC Oil & Gas Ltd. | 223.70 | 0 | 0.00 |
2018 | TORC Oil & Gas Ltd. | 35.20 | 0 | 0.00 |
2019 | TORC Oil & Gas Ltd. | 0.00 | 0 | 0.00 |
2020 | TORC Oil & Gas Ltd. | 0.00 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Crescent Point Energy Corp. | 8,856.60 | 324 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Crescent Point Energy Corp. | 5,345.00 | 359 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Crescent Point Energy Corp. | 5,166.00 | 366 | 0.00 | 0 | 0.00 | 0.00 |
2017 | TORC Oil & Gas Ltd. | 7,175.90 | 365 | 0.60 | 730 | 0.00 | 0.00 |
2018 | TORC Oil & Gas Ltd. | 1,934.20 | 85 | 2.00 | 170 | 0.00 | 0.00 |
2019 | TORC Oil & Gas Ltd. | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
2020 | TORC Oil & Gas Ltd. | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]