If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.02-34-001-25W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.07531927,"lon":-100.74331655,"icon":""}]} |
Well Name: Waskada Unit No. 19 WIW | |
Country: Canada | |
Province: Manitoba | |
Township: 001 | |
Meridian: W1 | |
Range: 25 | |
Section: 34 | |
Division: Division No. 5 | |
Subdivision: Brenda-Waskada | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Water Injection Well | |
Spud Date: 2003-09-02 | |
License Date: 2003-09-03 | |
Well Total Depth: 953.00 | |
Latitude: 49.07531927 | |
Longitude: -100.74331655 |
For data sources see[1]
Date | Event |
---|---|
2003-09-03 | Location |
2003-09-11 | Waiting On Service Rig |
2003-10-07 | Completing |
2003-10-20 | Water Injection Well |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2003-09-02 | Precision Drilling (1987) Ltd. | 380 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2003-10-08 | HOLLOW STEEL CARRIER | 885.00 | 888.00 | 20 | N/A | 2003-11-27 |
2003-10-08 | HOLLOW STEEL CARRIER | 889.00 | 892.00 | 20 | N/A | 2003-11-27 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2003-10-09 | ACID JOB | PLATINUM 4000 15% | 3.5 | N/A | ||
2004-03-24 | CHEMICAL SQUEEZE | GYPX-1 | 3.0 | N/A | ||
2004-03-26 | ACID JOB | 15 % HCL | 1.5 | N/A | ||
2004-03-26 | ACID JOB | 12/3 HCL/HF | 1.0 | N/A | ||
2004-03-26 | INHIBITOR | CRW-132 | 50.0 | N/A |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | 0.00 | 0 | 0.00 | |
2015 | 0.00 | 0 | 0.00 | |
2016 | 0.00 | 0 | 0.00 | |
2017 | 0.00 | 0 | 0.00 | |
2018 | 0.00 | 0 | 0.00 | |
2019 | 0.00 | 0 | 0.00 | |
2020 | 0.00 | 0 | 0.00 |
For data sources see[6]