If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.03-03-013-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.07923005,"lon":-101.23493922,"icon":""}]} |
Well Name: East Manson Unit No. 2 HZNTL WIW | |
Country: Canada | |
Province: Manitoba | |
Township: 013 | |
Meridian: W1 | |
Range: 28 | |
Section: 10 | |
Division: Division No. 15 | |
Subdivision: Ellice-Archie | |
Operator Name: TORC Oil & Gas Ltd. | |
License Status: Water Injection Well | |
Spud Date: 2013-03-13 | |
License Date: 2013-05-06 | |
Well Total Depth: 2144.00 | |
Latitude: 50.07923005 | |
Longitude: -101.23493922 |
For data sources see[1]
Date | Event |
---|---|
2013-05-06 | Location |
2013-07-22 | Drilling Ahead |
2013-07-24 | Waiting On Service Rig |
2013-08-01 | Completing |
2013-08-22 | Capable Of Oil Production |
2016-01-15 | Water Injection Well |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2013-03-13 | Red Dog Drilling Inc. | 2 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2013-08-06 | 868.00 | 869.00 | 0 | N/A | ||
2013-08-06 | 957.00 | 958.00 | 0 | N/A | ||
2013-08-06 | 1045.00 | 1046.00 | 0 | N/A | ||
2013-08-06 | 1121.00 | 1122.00 | 0 | N/A | ||
2013-08-06 | 1210.00 | 1211.00 | 0 | N/A | ||
2013-08-06 | 1298.00 | 1299.00 | 0 | N/A | ||
2013-08-06 | 1387.00 | 1388.00 | 0 | N/A | ||
2013-08-06 | 1463.00 | 1464.00 | 0 | N/A | ||
2013-08-06 | 1551.00 | 1552.00 | 0 | N/A | ||
2013-08-06 | 1640.00 | 1641.00 | 0 | N/A | ||
2013-08-06 | 1726.00 | 1727.00 | 0 | N/A | ||
2013-08-06 | 1804.00 | 1805.00 | 0 | N/A | ||
2013-08-06 | 1885.00 | 1886.00 | 0 | N/A | ||
2013-08-06 | 1975.00 | 1976.00 | 0 | N/A | ||
2013-08-06 | 2064.00 | 2065.00 | 0 | N/A | ||
2013-08-06 | 2127.00 | 2128.00 | 0 | N/A |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2020-03-02 | ACID JOB | 15 % HCL | 3.0 | N/A |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Crescent Point Energy Corp. | 3,756.90 | 0 | 0.00 |
2015 | Crescent Point Energy Corp. | 1,674.00 | 0 | 0.00 |
2016 | Crescent Point Energy Corp. | 0.00 | 0 | 0.00 |
2017 | 0.00 | 0 | 0.00 | |
2018 | 0.00 | 0 | 0.00 | |
2019 | 0.00 | 0 | 0.00 | |
2020 | 0.00 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Crescent Point Energy Corp. | 4,965.10 | 327 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Crescent Point Energy Corp. | 4,101.70 | 342 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Crescent Point Energy Corp. | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]