If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.08-06-010-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.80382133,"lon":-101.28023605,"icon":""}]} |
Well Name: Tundra et al Daly Sinclair Prov. HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 010 | |
Meridian: W1 | |
Range: 28 | |
Section: 06 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2011-10-14 | |
License Date: 2011-10-18 | |
Well Total Depth: 2193.00 | |
Latitude: 49.80382133 | |
Longitude: -101.28023605 |
For data sources see[1]
Date | Event |
---|---|
2011-10-18 | Location |
2011-10-24 | Waiting On Service Rig |
2011-10-28 | Completing |
2011-11-07 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2011-10-14 | Ensign Drilling Inc. | 14 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2011-11-01 | LINER PORT | 2178.72 | 2178.72 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 2124.47 | 2124.47 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 2070.39 | 2070.39 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 2016.27 | 2016.27 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1962.34 | 1962.34 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1908.08 | 1908.08 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1853.87 | 1853.87 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1799.62 | 1799.62 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1745.36 | 1745.36 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1691.11 | 1691.11 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1609.86 | 1609.86 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1488.22 | 1488.22 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1433.96 | 1433.96 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1379.73 | 1379.73 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1325.68 | 1325.68 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1271.41 | 1271.41 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1217.23 | 1217.23 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1162.98 | 1162.98 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1108.77 | 1108.77 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1054.52 | 1054.52 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 1000.25 | 1000.25 | 0 | N/A | 2011-12-11 |
2011-11-01 | LINER PORT | 959.50 | 959.50 | 0 | N/A | 2011-12-11 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2011-11-01 | FRAC | N/A | 20/40 | SAND | 3.2 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 3.2 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 3.2 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 3.2 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 3.2 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 3.2 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 3.2 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2011-11-01 | FRAC | N/A | 20/40 | SAND | 5.3 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 452.20 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 330.60 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 269.20 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 228.00 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 119.70 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 47.50 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 17.50 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 2,759.30 | 339 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 2,333.70 | 356 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 1,819.50 | 364 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 1,507.90 | 364 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 1,192.40 | 362 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 279.10 | 90 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 126.90 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]