If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1006052503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":57.70413,"lon":-118.671184,"icon":""}]} |
Location: 00/03-25-100-05W6/0 | |
Location Alias: 00/03-25-00-05 W6M | |
Location Alias 2: 00/03-25-100-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 100 | |
Meridian: 6 | |
Range: 05 | |
Section: 25 | |
County/Municipality: County of Northern Lights | |
Well Name: CANOR BIG ARROW 3-25-100-5 | |
Operator Name: Enerplus Corporation | |
License Number: 0211499 | |
License Date: 1998-01-06 | |
License Status: RecCertified | |
Spud Date: 1998-02-15 | |
Final Drill Date: 1998-02-19 | |
Well Total Depth: 665.00 m | |
Surface Hole Latitude: 57.704130 | |
Surface Hole Longitude: -118.671184 |
Date | Event |
---|---|
1998-01-06 | Obtained License |
1998-02-16 | Surface Casing Operation Performed |
1998-02-19 | Drill Stem Test Performed |
1998-02-19 | Finished Drilling |
1998-02-19 | Well Log Performed |
1998-02-20 | Drill Stem Test Performed |
1998-02-21 | Production Casing Operation Performed |
1998-02-21 | Rig Released |
1998-02-21 | Well Mode changed to Drilled and Cased |
1999-02-20 | Perforation Treatment Performed - Jet Perforation |
1999-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-02-25 | Perforation Treatment Performed - Jet Perforation |
1999-02-25 | Well Log Performed |
1999-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-03-05 | Perforation Treatment Performed - Fractured |
2000-01-10 | Well Began Production |
2000-01-10 | Well Fluid changed to Crude Oil |
2000-01-10 | Well Mode changed to Flowing |
2000-05-01 | Well Fluid changed to Crude Oil |
2000-05-01 | Well Mode changed to Suspended |
2005-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-01-19 | Plug Back Performed |
2005-01-19 | Well Fluid changed to Crude Oil |
2005-01-19 | Well Log Performed |
2005-01-19 | Well Mode changed to Abandoned Zone |
2005-01-25 | Well Abandoned |
2005-01-25 | Well Fluid changed to Crude Oil |
2005-01-25 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-02-20 | Perforation | 615.50 | 618.30 | 20 |
1999-02-23 | Acid Treatment | 615.50 | 618.30 | 0 |
1999-02-25 | Perforation | 621.00 | 625.00 | 20 |
1999-02-25 | Perforation | 633.00 | 639.00 | 20 |
1999-02-26 | Acid Treatment | 621.00 | 639.00 | 0 |
1999-03-05 | Fracture | 615.50 | 639.00 | 0 |
2005-01-19 | Packing Device Capped w/Cement | 592.50 | 600.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1247 | 0.0 | 0.0 | 0.0 |
For data sources see[5]