If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1016052313000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":57.77916,"lon":-118.699176,"icon":""}]} |
| Location: 00/13-23-101-05W6/0 | |
| Location Alias: 00/13-23-01-05 W6M | |
| Location Alias 2: 00/13-23-101-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 101 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 23 | |
| County/Municipality: County of Northern Lights | |
| Well Name: SLE HARO 13-23-101-5 | |
| Operator Name: SanLing Energy Ltd. | |
| License Number: 0405553 | |
| License Date: 2008-12-08 | |
| License Status: Suspension | |
| Spud Date: 2009-01-16 | |
| Final Drill Date: 2009-01-23 | |
| Well Total Depth: 1311.00 m | |
| Surface Hole Latitude: 57.779160 | |
| Surface Hole Longitude: -118.699176 |
| Date | Event |
|---|---|
| 2008-12-08 | Obtained License |
| 2009-01-17 | Surface Casing Operation Performed |
| 2009-01-18 | Direction Drilling Operation Performed - Horizontal |
| 2009-01-19 | Well Log Performed |
| 2009-01-20 | Intermediate Casing Operation Performed |
| 2009-01-23 | Finished Drilling |
| 2009-01-23 | Well Log Performed |
| 2009-01-23 | Well Mode changed to Drilled and Cased |
| 2009-01-25 | Liner Casing Operation Performed |
| 2009-01-25 | Perforation Treatment Performed - Open-Hole Completion |
| 2009-01-25 | Perforation Treatment Performed - Slotted Liner or Casing |
| 2009-01-26 | Rig Released |
| 2009-02-02 | Perforation Treatment Performed - Fractured |
| 2009-03-06 | Well Began Production |
| 2009-03-06 | Well Fluid changed to Crude Oil |
| 2009-03-06 | Well Mode changed to Pumping |
| 2011-03-22 | Well Began Injection |
| 2011-03-22 | Well Fluid changed to Water |
| 2011-03-22 | Well Type changed to Disposal |
| 2012-12-06 | Well Fluid changed to Water |
| 2012-12-06 | Well Mode changed to Suspended |
| 2012-12-06 | Well Type changed to Disposal |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-01-18 | 315.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-01-25 | Open Hole/Barefoot Completion | 1295.00 | 1311.00 | 0 |
| 2009-01-25 | Slotted Liner | 651.00 | 1295.00 | 0 |
| 2009-02-02 | Fracture | 727.20 | 1219.40 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 1048 | 0.0 | 0.0 | 0.0 |
| 2010 | 1250 | 0.0 | 0.0 | 0.0 |
| 2011 | 0 | 0.0 | 0.0 | 0.0 |
| 2012 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]