X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1016070204000

Well Details

Well ID: 1016070204000
Loading map...
Location: 00/04-02-101-07W6/0
Location Alias: 00/04-02-01-07 W6M
Location Alias 2: 00/04-02-101-07 W6/00
Country: Canada
Province: Alberta
Township: 101
Meridian: 6
Range: 07
Section: 02
County/Municipality: County of Northern Lights
Well Name: TUSK CORP WILDERNESS MEGA 4-2-101-7
Operator Name: Polar Star Canadian Oil And Gas, Inc.
License Number: 0320671
License Date: 2004-12-02
License Status: Abandoned
Spud Date: 2004-12-28
Final Drill Date: 2005-01-19
Well Total Depth: 2460.00 m
Surface Hole Latitude: 57.732942
Surface Hole Longitude: -119.036162

For data sources see[1][2]

Well History

Date Event
2004-12-02 Obtained License
2004-12-30 Surface Casing Operation Performed
2005-01-19 Finished Drilling
2005-01-19 Well Mode changed to Drilled and Cased
2005-01-20 Well Log Performed
2005-01-22 Production Casing Operation Performed
2005-01-24 Rig Released
2005-02-02 Well Log Performed
2005-02-03 Perforation Treatment Performed - Jet Perforation
2005-02-03 Well Log Performed
2005-02-05 Well Fluid changed to Gas
2005-02-05 Well Mode changed to Testing
2005-04-27 Well Began Production
2005-04-27 Well Fluid changed to Gas
2005-04-27 Well Mode changed to Flowing
2005-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-01-09 Well Log Performed
2006-01-10 Well Log Performed
2006-01-11 Perforation Treatment Performed - Jet Perforation
2006-01-12 Well Log Performed
2006-01-16 Well Log Performed
2006-01-17 Well Log Performed
2006-01-18 Perforation Treatment Performed - Jet Perforation
2006-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-01-25 Well Log Performed
2006-08-01 Well Fluid changed to Gas
2006-08-01 Well Mode changed to Suspended
2010-01-21 Well Log Performed
2010-01-22 Perforation Treatment Performed - Jet Perforation
2010-01-22 Well Log Performed
2016-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-01-29 Plug Back Performed
2016-01-29 Well Fluid changed to Gas
2016-01-29 Well Mode changed to Abandoned Zone
2016-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-01-30 Plug Back Performed
2016-01-31 Well Log Performed
2016-02-01 Perforation Treatment Performed - Jet Perforation
2016-02-01 Well Log Performed
2016-02-02 Well Log Performed
2016-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-03 Perforation Treatment Performed - Cement Squeeze
2016-02-03 Plug Back Performed
2016-02-04 Perforation Treatment Performed - Jet Perforation
2016-02-04 Well Log Performed
2016-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-06 Perforation Treatment Performed - Cement Squeeze
2016-02-06 Plug Back Performed
2016-02-18 Well Log Performed
2016-02-19 Perforation Treatment Performed - Jet Perforation
2016-02-19 Well Log Performed
2016-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-22 Perforation Treatment Performed - Jet Perforation
2016-02-22 Plug Back Performed
2016-02-22 Well Log Performed
2016-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-23 Perforation Treatment Performed - Cement Squeeze
2016-02-23 Plug Back Performed
2016-02-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-03 Perforation 2380.50 2385.00 20
2016-02-03 Cement Squeeze 570.00 571.00 0
2016-02-03 Packing Device Capped w/Cement 553.00 565.00 0
2016-02-04 Perforation 515.00 516.00 20
2016-02-06 Cement Squeeze 515.00 516.00 0
2016-02-06 Packing Device Capped w/Cement 495.00 510.00 0
2016-02-19 Perforation 443.00 444.00 20
2016-02-22 Packing Device Capped w/Cement 425.00 433.00 0
2016-02-22 Perforation 399.00 400.00 20
2016-02-23 Cement Squeeze 399.00 400.00 0
2016-02-23 Packing Device Capped w/Cement 379.50 391.50 0
2005-09-03 Acid Treatment 2380.50 2385.00 0
2006-01-11 Perforation 2387.00 2389.00 17
2006-01-18 Perforation 2371.50 2378.00 17
2006-01-21 Acid Treatment 2376.80 2378.10 0
2010-01-22 Perforation 2034.00 2037.00 17
2016-01-29 Packing Device Capped w/Cement 2349.30 2357.30 0
2016-01-30 Packing Device Capped w/Cement 2015.90 2023.90 0
2016-02-01 Perforation 570.00 571.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2288 0.0 0.0 0.0
2006 2 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References