If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.02-19-010-29W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.84437755,"lon":-101.38289908,"icon":""}]} |
Well Name: Tundra Daly Sinclair HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 010 | |
Meridian: W1 | |
Range: 29 | |
Section: 20 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2011-07-25 | |
License Date: 2011-07-14 | |
Well Total Depth: 2402.00 | |
Latitude: 49.84437755 | |
Longitude: -101.38289908 |
For data sources see[1]
Date | Event |
---|---|
2011-07-14 | Location |
2011-08-29 | Drilling Ahead |
2011-09-03 | Waiting On Service Rig |
2011-11-16 | Completing |
2011-11-22 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2011-07-25 | CanElson Drilling Inc. | 28 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2011-10-24 | LINER PORT | 2358.00 | 2358.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 2318.00 | 2318.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 2260.00 | 2260.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 2202.00 | 2202.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 2144.00 | 2144.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 2086.00 | 2086.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 2028.00 | 2028.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1854.00 | 1854.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1739.00 | 1739.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1681.00 | 1681.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1623.00 | 1623.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1559.00 | 1559.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1507.00 | 1507.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1449.00 | 1449.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1391.00 | 1391.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1333.00 | 1333.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1275.00 | 1275.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1218.00 | 1218.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1160.00 | 1160.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1102.00 | 1102.00 | 0 | N/A | 2011-12-09 |
2011-10-24 | LINER PORT | 1044.00 | 1044.00 | 0 | N/A | 2011-12-09 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2011-10-24 | FRAC | N/A | 20/40 | SAND | 6.7 | |
2011-10-25 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-10-25 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-10-25 | FRAC | N/A | 20/40 | SAND | 3.3 | |
2011-10-25 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-10-25 | FRAC | N/A | 20/40 | SAND | 2.5 | |
2011-10-26 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-10-26 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-10-26 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-10-26 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-10-26 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-10-24 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-26 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-10-26 | FRAC | N/A | 20/40 | SAND | 3.0 | |
2011-10-24 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-24 | FRAC | N/A | 20/40 | SAND | 7.0 | |
2011-10-24 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-10-24 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-10-24 | FRAC | N/A | 20/40 | SAND | 1.2 | |
2011-10-25 | FRAC | N/A | 20/40 | SAND | 5.0 | |
2011-10-25 | FRAC | N/A | 20/40 | SAND | 5.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 490.40 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 603.70 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 305.80 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 220.80 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 196.10 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 50.10 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 41.20 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 1,534.80 | 342 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 1,091.20 | 358 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 742.20 | 351 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 448.60 | 348 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 290.50 | 356 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 94.60 | 73 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 110.60 | 59 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]