If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.03-12-011-27W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.90268948,"lon":-101.04751412,"icon":""}]} |
Well Name: ERCO Virden Prov. SSW | |
Country: Canada | |
Province: Manitoba | |
Township: 011 | |
Meridian: W1 | |
Range: 27 | |
Section: 12 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: ERCO Worldwide | |
License Status: Salt Solution Well | |
Spud Date: 2001-03-01 | |
License Date: 2001-03-05 | |
Well Total Depth: 1185.00 | |
Latitude: 49.90268948 | |
Longitude: -101.04751412 |
For data sources see[1]
Date | Event |
---|---|
2001-03-05 | Location |
2001-03-26 | Drilling Ahead |
2001-03-30 | Waiting On Service Rig |
2001-08-24 | Salt Solution Well |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2001-03-01 | Ensign Drilling Inc. | 91 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2002-07-08 | 1165.80 | 1169.30 | 0 | N/A | 2002-10-24 | |
2002-06-20 | 1166.80 | 1169.30 | 0 | N/A | 2002-10-24 | |
2001-11-09 | 1169.00 | 1174.50 | 0 | N/A | 2002-02-13 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2002-11-14 | ACID JOB | 15 % HCL | 5.0 | N/A | ||
2003-02-28 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-03-06 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-03-22 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-04-04 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-04-21 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-05-02 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-05-16 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-06-02 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-09-19 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-10-01 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2002-12-02 | ACID JOB | 15 % HCL | 10.0 | N/A | ||
2003-10-13 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-10-24 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-10-27 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-11-16 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-11-21 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-12-01 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2004-02-15 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2004-02-20 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2004-03-04 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2004-03-11 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2002-12-13 | ACID JOB | 15 % HCL | 3.0 | N/A | ||
2004-04-08 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2004-04-08 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2004-06-17 | ACID JOB | 15 % HCL | 3.0 | N/A | ||
2002-12-24 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-01-03 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-01-19 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-01-31 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-02-10 | ACID JOB | 15 % HCL | 2.0 | N/A | ||
2003-02-19 | ACID JOB | 15 % HCL | 2.0 | N/A |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | 0.00 | 0 | 0.00 | |
2015 | 0.00 | 0 | 0.00 | |
2016 | 0.00 | 0 | 0.00 | |
2017 | 0.00 | 0 | 0.00 | |
2018 | 0.00 | 0 | 0.00 | |
2019 | 0.00 | 0 | 0.00 | |
2020 | 0.00 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2001 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 31,897.00 |
2002 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 122,954.60 |
2003 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 165,594.00 |
2004 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 128,056.00 |
2005 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 103,497.00 |
2006 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 119,028.00 |
2007 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 43,735.00 |
2008 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 76,424.00 |
2009 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 76,568.00 |
2014 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 80,741.90 |
2015 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 7,017.30 |
2016 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 9,591.80 |
2017 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 8,457.50 |
2018 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 7,514.30 |
2019 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 1,648.30 |
2020 | ERCO Worldwide | 0.00 | 0 | 0.00 | 0 | 0.00 | 22,443.00 |
For data sources see[7]