If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.04-36-002-29W1 | |
Well Name: TEI Pierson Prov. HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 002 | |
Meridian: W1 | |
Range: 29 | |
Section: 36 | |
Division: Division No. 5 | |
Subdivision: Two Borders | |
Operator Name: Tallahassee Exploration Inc. | |
License Status: Capable Of Oil Production | |
Spud Date: 2013-11-15 | |
License Date: 2013-11-20 | |
Well Total Depth: 1772.00 | |
Latitude: 49.17124175 | |
Longitude: -101.24401805 |
For data sources see[1]
Date | Event |
---|---|
2013-11-20 | Location |
2014-01-02 | Waiting On Service Rig |
2014-02-03 | Completing |
2014-02-07 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2013-11-15 | Precision Drilling | 156 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2014-01-29 | HOLLOW STEEL CARRIER | 1748.00 | 1748.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1715.00 | 1715.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1679.00 | 1679.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1645.00 | 1645.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1612.00 | 1612.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1574.00 | 1574.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1541.40 | 1542.00 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1507.00 | 1507.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1473.50 | 1474.00 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1365.00 | 1365.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1437.00 | 1437.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1402.00 | 1402.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1330.00 | 1330.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1297.00 | 1297.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1262.00 | 1262.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1226.00 | 1226.50 | 0 | N/A | 2018-01-07 |
2014-01-29 | HOLLOW STEEL CARRIER | 1193.00 | 1193.50 | 0 | N/A | 2018-01-07 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.4 | 20/40 | SAND | N/A |
2014-01-31 | FRAC | ACID | 0.4 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 2.5 |
2014-01-31 | FRAC | ACID | 0.4 | 20/40 | SAND | 1.0 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 2.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-01-31 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | NAL Resources Limited | 1,010.60 | 0 | 0.00 |
2015 | NAL Resources Limited | 729.00 | 0 | 0.00 |
2016 | NAL Resources Limited | 522.90 | 0 | 0.00 |
2017 | Tallahassee Exploration Inc. | 305.10 | 0 | 0.00 |
2018 | Tallahassee Exploration Inc. | 211.00 | 0 | 0.00 |
2019 | Tallahassee Exploration Inc. | 0.00 | 0 | 0.00 |
2020 | Tallahassee Exploration Inc. | 39.00 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | NAL Resources Limited | 2,379.30 | 207 | 37.10 | 207 | 0.00 | 0.00 |
2015 | NAL Resources Limited | 1,751.50 | 346 | 50.30 | 346 | 0.00 | 0.00 |
2016 | NAL Resources Limited | 1,250.70 | 343 | 36.20 | 343 | 0.00 | 0.00 |
2017 | Tallahassee Exploration Inc. | 950.10 | 349 | 59.80 | 698 | 0.00 | 0.00 |
2018 | Tallahassee Exploration Inc. | 677.50 | 327 | 69.80 | 685 | 0.00 | 0.00 |
2019 | Tallahassee Exploration Inc. | 0.00 | 0 | 1.50 | 343 | 0.00 | 0.00 |
2020 | Tallahassee Exploration Inc. | 104.40 | 59 | 0.00 | 59 | 0.00 | 0.00 |
For data sources see[7]