If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.08-16-001-25W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.03391081,"lon":-100.77040662,"icon":""}]} |
Well Name: Waskada Unit No. 22 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 001 | |
Meridian: W1 | |
Range: 25 | |
Section: 16 | |
Division: Division No. 5 | |
Subdivision: Brenda-Waskada | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2010-01-20 | |
License Date: 2010-09-07 | |
Well Total Depth: 1646.00 | |
Latitude: 49.03391081 | |
Longitude: -100.77040662 |
For data sources see[1]
Date | Event |
---|---|
2010-09-07 | Location |
2010-12-11 | Surface Casing Set |
2011-01-04 | Drilling Ahead |
2011-01-09 | Waiting On Service Rig |
2011-01-23 | Completing |
2011-02-08 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2010-01-20 | Precision Drilling | 195 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2011-01-24 | HOLLOW STEEL CARRIER | 1621.00 | 1622.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1586.00 | 1587.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1552.00 | 1553.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1517.00 | 1518.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1484.00 | 1485.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1449.00 | 1450.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1416.00 | 1417.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1376.00 | 1377.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1336.00 | 1337.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1296.00 | 1297.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1256.00 | 1257.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1216.00 | 1217.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1176.00 | 1177.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1136.00 | 1137.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1096.00 | 1097.00 | 9 | N/A | 2011-05-30 |
2011-01-24 | HOLLOW STEEL CARRIER | 1056.00 | 1057.00 | 9 | N/A | 2011-05-30 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-29 | FRAC | N/A | 20/40 | SAND | 2.7 | |
2011-01-29 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-29 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 | |
2011-01-28 | FRAC | N/A | 20/40 | SAND | 4.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 320.50 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 99.80 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 284.80 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 651.70 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 547.90 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 118.50 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 93.90 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 461.10 | 365 | 30.70 | 365 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 140.00 | 251 | 4.80 | 251 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 453.20 | 98 | 11.30 | 98 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 889.30 | 359 | 72.80 | 718 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 588.10 | 350 | 27.40 | 700 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 123.00 | 88 | 8.40 | 448 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 106.80 | 57 | 0.00 | 57 | 0.00 | 0.00 |
For data sources see[7]