If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 102.11-02-010-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.80036008,"lon":-101.18154025,"icon":""}]} |
Well Name: Tundra Daly Sinclair HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 010 | |
Meridian: W1 | |
Range: 28 | |
Section: 02 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2017-02-07 | |
License Date: 2017-01-13 | |
Well Total Depth: 1538.00 | |
Latitude: 49.80036008 | |
Longitude: -101.18154025 |
For data sources see[1]
Date | Event |
---|---|
2017-01-13 | Location |
2017-02-06 | Moving In Rotary Tools |
2017-02-10 | Waiting On Service Rig |
2017-03-05 | Completing |
2017-03-06 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2017-02-07 | Ensign Drilling Inc. | 12 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2017-02-26 | 1523.57 | 1533.57 | 0 | N/A | 2019-03-06 | |
2017-02-26 | 1487.30 | 1497.30 | 0 | N/A | 2019-03-06 | |
2017-02-26 | 1451.50 | 1461.50 | 0 | N/A | 2019-03-06 | |
2017-02-26 | 1416.20 | 1426.20 | 0 | N/A | 2019-03-06 | |
2017-02-26 | 1380.80 | 1390.80 | 0 | N/A | 2019-03-06 | |
2017-02-26 | 1345.80 | 1355.80 | 0 | N/A | 2019-03-06 | |
2017-02-26 | 1310.80 | 1320.80 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 1274.90 | 1284.90 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 1239.50 | 1249.50 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 1203.40 | 1213.40 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 1167.70 | 1177.70 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 1131.90 | 1141.90 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 1095.50 | 1105.50 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 1061.50 | 1071.50 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 1026.30 | 1036.30 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 990.50 | 1000.50 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 954.70 | 964.70 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 918.90 | 928.90 | 0 | N/A | 2019-03-06 | |
2017-02-27 | 862.90 | 872.90 | 0 | N/A | 2019-03-06 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2017-02-26 | FRAC | 15 % HCL | 2.0 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-26 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 5.0 |
2017-02-26 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 5.0 |
2017-02-26 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 5.0 |
2017-02-26 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 5.0 |
2017-02-26 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 5.0 |
2017-02-26 | FRAC | 15 % HCL | 1.0 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
2017-02-27 | FRAC | 15 % HCL | 0.5 | 20/40 | SAND | 5.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2017 | Tundra Oil & Gas Limited | 5,320.40 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 5,206.20 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 648.00 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 354.50 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2017 | Tundra Oil & Gas Limited | 3,346.20 | 263 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 1,971.50 | 352 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 313.70 | 89 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 111.40 | 56 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]