X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1035232811000

Well Details

Well ID: 1035232811000
Loading map...
Location: 00/11-28-103-23W5/0
Location Alias: 00/11-28-03-23 W5M
Location Alias 2: 00/11-28-103-23 W5/00
Country: Canada
Province: Alberta
Township: 103
Meridian: 5
Range: 23
Section: 28
County/Municipality: Paddle Prairie Metis Settlement
Well Name: GUIDEX BOYER 11-28-103-23
Operator Name: Long Run Exploration Ltd.
License Number: 0162281
License Date: 1993-11-15
License Status: RecCertified
Spud Date: 1993-11-30
Final Drill Date: 1993-12-03
Well Total Depth: 360.00 m
Surface Hole Latitude: 57.971853
Surface Hole Longitude: -117.747267

For data sources see[1][2]

Well History

Date Event
1993-11-15 Obtained License
1993-11-29 Well Log Performed
1993-12-01 Surface Casing Operation Performed
1993-12-02 Lost Circulation Occurred
1993-12-03 Finished Drilling
1993-12-03 Production Casing Operation Performed
1993-12-03 Rig Released
1993-12-03 Well Log Performed
1993-12-03 Well Mode changed to Drilled and Cased
1993-12-05 Perforation Treatment Performed - Jet Perforation
1993-12-05 Well Log Performed
1993-12-11 Perforation Treatment Performed - Fractured
1994-03-06 Well Log Performed
1994-03-07 Perforation Treatment Performed - Cement Squeeze
1994-03-09 Perforation Treatment Performed - Jet Perforation
1994-03-09 Well Log Performed
1994-03-13 Well Log Performed
1994-03-22 Well Began Production
1994-03-22 Well Fluid changed to Gas
1994-03-22 Well Mode changed to Flowing
1994-04-30 Well Fluid changed to Gas
1994-04-30 Well Mode changed to Suspended
2002-03-15 Well Log Performed
2002-03-17 Well Log Performed
2002-03-23 Perforation Treatment Performed - Jet Perforation
2002-03-23 Well Log Performed
2002-03-24 Perforation Treatment Performed - Jet Perforation
2002-03-24 Well Log Performed
2002-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-26 Plug Back Performed
2002-03-26 Well Fluid changed to Gas
2002-03-26 Well Mode changed to Abandoned Zone
2004-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-11 Well Abandoned
2004-03-11 Well Fluid changed to Gas
2004-03-11 Well Log Performed
2004-03-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-12-05 Perforation 304.50 310.00 13
1993-12-11 Fracture 304.50 310.00 0
1994-03-07 Cement Squeeze 304.50 310.00 0
1994-03-09 Perforation 303.70 305.70 13
2002-03-23 Perforation 114.00 118.00 17
2002-03-23 Perforation 43.00 45.00 17
2002-03-24 Perforation 36.00 38.00 17
2002-03-26 Packing Device Capped w/Cement 102.00 112.00 0
2004-03-11 Packing Device Capped w/Cement 24.00 32.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 403 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-12-02 Lost Circulation 119.00 122.00

For data sources see[6]

References