If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 104.03-29-001-25W1 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Well Name: TEI Waskada Prov. HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 001 | |
Meridian: W1 | |
Range: 25 | |
Section: 30 | |
Division: Division No. 5 | |
Subdivision: Brenda-Waskada | |
Operator Name: Tallahassee Exploration Inc. | |
License Status: Capable Of Oil Production | |
Spud Date: 2012-12-15 | |
License Date: 2012-12-07 | |
Well Total Depth: 1686.00 | |
Latitude: 49.06103099 | |
Longitude: -100.80407094 |
For data sources see[1]
Date | Event |
---|---|
2012-12-07 | Location |
2014-01-20 | Drilling Ahead |
2014-01-22 | Waiting On Service Rig |
2014-02-12 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2012-12-15 | Precision Drilling | 409 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2014-01-28 | HOLLOW STEEL CARRIER | 1086.00 | 1086.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1119.00 | 1119.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1154.00 | 1154.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1187.00 | 1187.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1221.00 | 1221.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1254.00 | 1254.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1289.00 | 1289.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1321.00 | 1321.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1357.00 | 1357.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1391.50 | 1392.00 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1424.50 | 1425.00 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1459.00 | 1459.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1493.00 | 1493.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1527.00 | 1527.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1560.50 | 1561.00 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1595.00 | 1595.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1629.00 | 1629.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1663.00 | 1663.50 | 0 | N/A | 2018-12-05 |
2014-01-28 | HOLLOW STEEL CARRIER | 1664.00 | 1664.50 | 0 | N/A | 2018-12-05 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.5 |
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 0.5 |
2014-02-01 | FRAC | ACID | N/A | 20/40 | SAND | N/A |
2014-02-02 | FRAC | ACID | 0.5 | 30/40 | SAND | 4.0 |
2014-02-02 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.0 |
2014-02-02 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.0 |
2014-02-01 | FRAC | ACID | 0.8 | 20/40 | SAND | 4.0 |
2014-02-02 | FRAC | ACID | 0.8 | 20/40 | SAND | 4.0 |
2014-02-02 | FRAC | ACID | 0.8 | 20/40 | SAND | 1.0 |
2014-02-02 | FRAC | ACID | 1.0 | 20/40 | SAND | 4.0 |
2014-02-02 | FRAC | ACID | 1.0 | 20/40 | SAND | 4.0 |
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.5 |
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.5 |
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.5 |
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.0 |
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.0 |
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.0 |
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 3.5 |
2014-02-01 | FRAC | ACID | 0.5 | 20/40 | SAND | 4.0 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | NAL Resources Limited | 2,919.50 | 0 | 0.00 |
2015 | NAL Resources Limited | 2,567.30 | 0 | 0.00 |
2016 | NAL Resources Limited | 1,116.80 | 0 | 0.00 |
2017 | Tallahassee Exploration Inc. | 1,339.60 | 0 | 0.00 |
2018 | Tallahassee Exploration Inc. | 350.50 | 0 | 0.00 |
2019 | Tallahassee Exploration Inc. | 0.00 | 0 | 0.00 |
2020 | Tallahassee Exploration Inc. | 152.30 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | NAL Resources Limited | 3,048.40 | 214 | 0.00 | 0 | 0.00 | 0.00 |
2015 | NAL Resources Limited | 2,029.10 | 339 | 0.00 | 0 | 0.00 | 0.00 |
2016 | NAL Resources Limited | 1,246.50 | 330 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Tallahassee Exploration Inc. | 1,030.40 | 339 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tallahassee Exploration Inc. | 546.00 | 309 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tallahassee Exploration Inc. | 0.00 | 0 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tallahassee Exploration Inc. | 260.60 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]