If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 104.11-06-001-24W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.0092963,"lon":-100.66655043,"icon":""}]} |
Well Name: Goodlands Unit No. 2 Prov. HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 001 | |
Meridian: W1 | |
Range: 24 | |
Section: 05 | |
Division: Division No. 5 | |
Subdivision: Brenda-Waskada | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2011-06-25 | |
License Date: 2011-06-23 | |
Well Total Depth: 2060.00 | |
Latitude: 49.0092963 | |
Longitude: -100.66655043 |
For data sources see[1]
Date | Event |
---|---|
2011-06-23 | Location |
2011-08-08 | Drilling Ahead |
2011-08-13 | Waiting On Service Rig |
2011-08-28 | Completing |
2011-11-26 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2011-06-25 | Big Sky Drilling/Ensign | 25 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2011-08-31 | HOLLOW STEEL CARRIER | 2031.00 | 2032.00 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1995.14 | 1996.14 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1959.33 | 1960.33 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1922.94 | 1923.94 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1887.01 | 1888.01 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1851.08 | 1852.08 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1814.66 | 1815.66 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1778.92 | 1779.92 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1742.98 | 1743.98 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1707.11 | 1708.11 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1671.26 | 1672.26 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1634.75 | 1635.76 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1598.88 | 1599.88 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1562.94 | 1563.94 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1526.98 | 1527.98 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1491.17 | 1492.17 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1455.16 | 1456.16 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1419.37 | 1420.37 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1455.16 | 1456.16 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1419.37 | 1420.37 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1382.91 | 1383.91 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1347.03 | 1348.03 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1311.14 | 1312.14 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1275.32 | 1276.32 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1238.88 | 1239.88 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1203.17 | 1204.17 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1166.78 | 1167.78 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1130.98 | 1131.98 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1095.23 | 1096.23 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1058.84 | 1059.84 | 17 | N/A | 2012-01-01 |
2011-08-31 | HOLLOW STEEL CARRIER | 1023.00 | 1024.00 | 17 | N/A | 2012-01-01 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2011-09-04 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-09-04 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-30 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-09-04 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-09-04 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-09-04 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-09-04 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 | |
2011-10-28 | FRAC | N/A | 20/40 | SAND | 3.5 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 3,601.20 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 1,106.00 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 373.20 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 189.00 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 408.30 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 49.70 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 7.60 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 12,751.70 | 352 | 105.80 | 352 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 8,847.40 | 354 | 61.90 | 354 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 6,218.50 | 366 | 3.40 | 366 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 5,851.70 | 360 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 4,380.50 | 363 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 722.10 | 90 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 506.70 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]